Archinect
Vincent Huang

Vincent Huang

New York, NY, US

 

PDF Portfolio

Employment 

studio IntraMuros, New York, NY, US, Project Manager

A design oriented architectural firm. Working along with principal from project inception to realization. Responsible for design, documentation, code review, consultant/vender selection, multiple engineering coordination. During realization, review construction bids, value engineer with client and G.C., administer construction until project completion.

Project :
•NYC HPD Ad Apt Micro Apartment RFP: Proposed prefabricated 10 stories, 27K Sq. Ft. 51 micro units apartment building. Initiated and responsible for the entire RFP process, included assemble the bid team members, the developer, and the pre-fab C.M. Personally designed and completing the HPD RFP application.

•Korman Guest House: Fort Washington, Pennsylvania, 1,000 square feet, exercise and spa accessory building on the property of Louis Kahn’s last designed house.

•AKA Hotel – Times Square: New York, 100 feet, $900,000 Façade renovation on a landmarked building. New Store fronts and entry.

•AKA Hotel - UN: New York, 7,000 square feet $800,000 hotel lobby and new entrance canopy.

Jul 2007 - current
 

Independent, New York, NY, US, Project Architect

•Consulted at 1100 Architect and West 4th Architecture. Worked as project architect at 1100 Architect on high-end townhouse renovation, produced permit and construction documents. Worked on design of two luxury residential buildings in Romania for West 4th Architecture. Produced design development drawing sets.

Dec 2006 - Jul 2007
 

Global Building Modules, New York, Project Architect

•A start-up multi-discipline company that utilized ISO shipping container to develop and manufacture modular building system. As part of the design department team, contributed to the dialogue and process of modularizing conventional building design, structure and life support system into a modular system; the module connectivity methodologies for mechanical, electrical and plumbing system during building erection.

Project :
•Prototype: 1,280 square feet, free standing structure with a one bed room and a studio apartment to serve as both technology demonstration showroom and development platform. Responsible for design, construction documents and consultant coordination.

•Crosby Street: New York, 21,000 square feet, 8 stories residential building, Responsible for interior design, BSA documents, construction documents, consultant coordination and construction administration.

•Lafayette Street: New York, 42,000 square feet 6 stories residential building, Responsible for interior design development, and interior architecture portion of the construction documents.

Mar 2006 - Dec 2006
 

studio IntraMuros, New York, NY, US, Project Architect

•A design oriented architectural firm. Working along with principal from project inception to realization. Responsible for design, documentation, code review, consultant/vender selection, multiple engineering coordination. During realization, review construction bids, value engineer with client and G.C., administer construction until project completion.

Jul 2003 - Mar 2006
 

Indenpendent, New York, NY, US, Project Architect

•Consulted at various firms, including SOM, KPF, and Rockwell Group. Private clients with minor apartment renovation and gut renovation project.

Sep 2002 - Jul 2003
 

Rietveld Architects, New York, NY, US, Project Architect

•A design oriented Dutch architecture firm based in New York. Responsible for multiple projects as the project point person with client’s project manager and project coordinator for structural and mechanical consultants. During design phase worked with design principal to create design presentation drawings consisting of computer renderings and animation. Managed a small team during design development phase to produce building permit and pricing drawing set. Other office administration tasks included, Cad manager (ArchiCAD), IT manager (Mac), mentoring of Intern Architects.

Project :
•Amstelland Ontwikkeling: Blokhoeve · Nieuwegein, 14,137 square meters, 12 stories commercial building. Responsible for construction documents, core and exterior.

•William Properties Rotterdam: Kantoorgebouw Amerikastraat ‘s-Hertogenbosch Den Bosch, 28,468 square meters commercial building complex with one 18 stories tower. Responsible for design development and presentation drawings.

•William Properties Rotterdam: Eastman European headquarter, Capelle. 6,022 square meters, 8 stories building. Produced area requirement and stacking diagram from client’s head count projection and space allocation. Space planning and test fit for 4,371 square meters programmed space.

Mar 2001 - Sep 2002
 

Gensler, New York, NY, US, Project Architect

•Responsibilities after two projects quickly advanced from cad architect to project architect handling multiple projects on different phases. Worked as a supporting role in a team atmosphere with project manager and project designer during design development phase. As project progresses, responsibilities expanded to lead a small team to produce construction document and coordinate project information with multiple consultants. Reviewed bids along with project manager during the bidding phase. In construction administration phase responsible for, shop drawing review, attend construction meeting, site visit report and punch list.

Project :
•Reckson Reality Association: 10,000 square feet mid-high range corporate interior. Responsible for construction documents, consultant coordination and construction administration.

•PricewaterhouseCoopers: San Jose and Raleigh, 40,000 square feet each, multi floors, corporate interior.

•Jack Shaffer & Company: 4,000 square feet mid-high range corporate interior. Project architect as well as junior project designer.

•UnumProvident: 20,000 square feet, corporate interior. Responsible for construction documents, consultant coordination and construction administration.

•Thomson Consumer Electronic: 6,000 square feet mid range corporate interior.

•Aveda: Several 1,000 square feet mall store rollout. Responsible for construction documents.

Nov 1998 - Mar 2001
 

Suben/Dougherty Partnership, New York, NY, US, Junior Project Architect

•A small design oriented interior architecture firm in New York. Responsible for producing presentation drawing that included computer rendering. Worked independently and under guidance on the construction document.

Project :
•New York Hospital, Geriatric Center: Written up in a article in The New York Times, a complete adaptive re-use restoration of 3 stories building on Upper East Side of Manhattan.

•New York Hospital, 6,000 square feet, Sport Medicine at Chelsea Sports Center: New physical therapy & examination rooms.

Mar 1995 - Oct 1998
 

David Huang Architect, New York, NY, US, Junior Architect

Jan 1993 - Jan 1995
 

Education 

NYU Schack Institute of Real Estate -SCPS, New York, NY, US, Real Estate

Real estate development and finance.

Sep 2011 - current
 

New York Institute of Technology, New York, NY, US, BArch, Achitectural

Sep 1986 - Jun 1992
 

Areas of Specialization 

Skills 



Please wait... loading