Additions and Alterations to Folsom School, in Hammonton, New Jersey, includes renovation of the existing facility and construction of two new additions. The additions are single-story structures with a total square footage of 22,000 +/- square feet. The “front” addition is a steel-framed masonry-clad structure containing new science, art and music classrooms; the “rear” addition is a pre-engineered steel structure housing the gymnasium/multipurpose room with adjoining masonry-clad full service kitchen, boys and girls locker rooms and toilet rooms, p.e. office, staff room, mech./elect. room and storage rooms.
In the capacity of full time on-site construction project manager/owner's representative, I was tasked with managing the following construction phase services: coordinate the work of five (5) separate prime contractors (GC, S, M, P, E); monitor the progress of the work; control construction quality; monitor safety program; recommend changes in the work; maintain jobsite records; conduct regular job meetings; prepare and distribute meeting minutes; coordinate processing of shop drawings and submittals; process payment requests; process change orders; manage testing agencies; monitor and edit the master schedule with contractor and owner-supplied work; provide daily liaison with the school district superintendent and board administrator; prepare monthly construction progress reports; implement and maintain digital photographic record of the project; and manage close out phase to a successful conclusion.
Renovation work included roof replacement and new roof canopy at existing main entry; window replacement and exterior wall modifications; HVAC replacement in classrooms including electrical and related work; alteration work within the existing all-purpose room and kitchen, including demolition of the existing stage, roofing and exterior metal wall panels; and rehabilitation /reconfiguration of the main office area, nurse’s suite, and men’s and women’s toilet rooms. Site work includes new bus drive and drop off area, barrier-free curb ramps and sidewalks, and underground storm drainage and utility systems work. All four phases of the project were completed on schedule and within the construction contingency funding limits. (Photos: Eric L. Girven)
Status: Built
Location: Hammonton, NJ, US
My Role: Site-Based CM Project Manager/Owner’s Representative
Additional Credits: Paul Vandergrift, GC Superintendent, Dandrea Construction
Tom Zeiders, GC Project Manager, Dandrea Construction
Steve Becica, Architect of Record, Becica Associates LLC
Dr. J. Allan Ferner, Superintendent, Folsom Board of Ed.
Scott Wheeler, Building Engineer, Folsom School
Joe Smurlo, Business Administrator, Folsom Board of Ed.
Patrick Kennedy, Plumbing Foreman, KB Mechanical
Dave Del Priscolli, Electrical Foreman, Martell Construction
Angelo Gaudelli, Mechanical Foreman, Gaudelli Bros.
Paul Rash, J.V. Palmonari (Structural Steel)