Archinect
Daniel Moran

Daniel Moran

Brooklyn, NY, US

anchor
Breakout Space
Breakout Space
6 more images  ↓

Dogpatch Labs Phase 2

Size - 8,000sqft

Value - €750,000 

Duration - 16 weeks 

Location - The chq building, Dublin 1

Collaborators:- Harry Browne, (OOF), Darmody Architects,

“Phase 2 of Dogpatch Labs”  expanded the office downstairs into the vaulted spaces beneath historically used for storing wine and whiskey as part of the bonded warehouses of Customs House Quay.

The setting provided its own challenge as a carefully curated palette of colours and materials was required to retain the character of the space. A more refined sense of place was needed to cater for a more corporate client while it was felt that it was important to stay in keeping with the playfulness and bootstrap nature of startup culture. Reclaimed iroko salvaged from elsewhere in the building and other redundant mechanical pieces repurposed as furniture further ground the contemporary insertions in the space. 

Conservation played an important role in retaining the dignity and character of the historic vaults and collaboration with conservation architect and the current building owners was a large factor in driving the project to completion.

Personal responsibilities involved the design, preparation of construction drawings and management of several custom furniture pieces (hot desks, bar, events space) and overall management of the interior fit-out contract (to include acoustic, furniture specification and lighting).

 
Read more

Status: Built
Location: Dublin, IE
My Role: Design Consultant, Inhouse Architectural Designer
Additional Credits: Darmody Architects
Harry Browne

 
Breakout Space
Breakout Space
Events Space
Events Space
Meeting Rooms
Meeting Rooms
Hospitality Bar
Hospitality Bar
Breakout Tables
Breakout Tables
Opening W/Irish Prime minister
Opening W/Irish Prime minister