With a new referendum freshly passed for state university construction funds, the new School of Business was released for final construction documents after having been placed on hold for several years. Significant program adjustments needed to be accommodated in the old design while not increasing the project budget or building footprint, and construction documents needed final coordination and updating to be prepared for the public bid process. The project is on track for LEED certification.
Status: Under Construction
Location: Montclair, NJ, US
My Role: Gross/Net square footage calculations and analysis with original tabular program guidelines and state requirements. Revit model adjustments, management, and coordination with various engineering consultants to fully adopt revisions and finalize drawing se
Additional Credits: Environetics Group Architects & Design (Arch. & Structural), TMG Engineering (MEP), Langan Engineering & Environmental Services, The Sextant Group