Archinect
Xuzhou LF Engineering & Construction Co., Ltd.

Xuzhou LF Engineering & Construction Co., Ltd.

Jiangsi, CN

anchor

Prefabricated steel structure church roof design

The Hand of God Church project includes a central dome with a span of 91 meters, five finger-shaped cylindrical structures, each of which can accommodate at least 20,000 people.

There are two scalloped roof structures on fingers 1 and 5. All roof structures are space frames covered with aluminium magnesium manganese roofing panels. The project has a total area of about 56,130 square meters and can accommodate more than 100,000 people.

 
Read more

Status: Under Construction
Location: Nigeria
Firm Role: Steel Structure Roofing Contractor
Additional Credits: Xuzhou LF Engineering & Construction Co., Ltd.