The scope of this hospitality project consisted of creating a BIM design models and coordination and collaboration of the architectural, structural and MEP designs. With the successful implementation of BIM, we were able to effectively communicate and manage the design model changes from multiple points. Different collaboration tools were used to make sure that latest design model is available to each team member at every moment. Effective clash detection during the coordination process provided valuable insights for designers to make the necessary changes.
Status: Built
Location: Williamstown, MA, US
Firm Role: BIM Modeling and Coordination