3D fabrication / structural design and full CNC documentation for a complex backdrop geometry over 40 feet in overall length. This projection mapped stage was featured as Invisible Children’s backdrop for their Fourth Estate Summit in 2013.
Status: Built
Location: Los Angeles, CA, US
Firm Role: Fabrication Design and CNC Production and Management
Additional Credits: Lucky13 - Assembly and Final Installation