Studio GAIA, New York, NY, US, Senior Project Manager
As Sr. Project Manager, Bilal was responsible with creating all DD,CD and FFE documentation and also managing the CA phase of the projects. Here is the list of projects he involved in :
Here are the project Bilal is involved as manager:
- Inspire Family Hotel 2017 @ Korea Republic / as Project Manager
- MGM National Harbor 2014-2016 @ Washington DC / as BIM Manager
- Director Hotel 2016-2017 @ Santiago, Chile / as Project Manager
- Adamas Office Design 2016 @ New York / as Project Manager
and there are some other projects that Bilal is assisted to the team:
- W Panama Hotel some FFE detail drawings
- Dream Hotel Canopy Design @ NY
- Cinepolis Theatre Design @ Mexico
- W Turks and Caicos
Partners for Architecture, Stamford, CT, US, Project Architect
As an project architect, Bilal was responsible with :
• Assisting for Zoning and Code Analyses of the projects.
• Assisting for the schematic design, design development and construction document phases of projects,
• Assisting on Permit Drawings, BBP, PA, CD and all other submission drawing sets.
He worked in BASIS Independent School project which is about 90,000 sf.