The 12’ x 12’ x 9’ installation is modular and preassembeled before the event, It consists of 10 identical panels, 2 door arches and 12 structural posts. 2x6 and 2x4 joists provide stability and support for each of the smaller ceiling panels.
All panels were laser cut and pre-assembeled in Los Angeles starting July 2019. The installation was flat packed into a 9’ cargo van and was built in two days before
Burning Man. During the event, the installation held many spontaneous gatherings,
including two proposals, a charcuterie party, an advice booth and a wedding.
Status: Built
Location: Gerlach, NV, US
My Role: Artist, Build Lead
Additional Credits: Build Crew: Rob Richards
Tori Youngblood
Max Berger