Archinect
ann hao

ann hao

Xuzhou, CN

anchor
Hot Spring World Space Frame Roof
Hot Spring World Space Frame Roof
3 more images  ↓

Hot Spring World Space Frame Roof

Project span: 75 m

Project length: 150m

Total construction area: 21458 m2

Project features: Hot Spring Water World consists of two indoor space frame building hall combination, respectively, for different functions and themes of the hot spring hall and water world hall, in the Vantone Hot Spring Water World on the basis of adding some large-scale water amusement facilities and characteristics of the hot spring pools, and children's theme water pools. The main body of the first area of the water park is an arched space frame with a span of 75 meters and a length of 150 meters, with a building area of 11,250 square meters; the connecting corridor of the second area of the water park is a single-storey steel structure with a width of 28 meters and a length of 186 meters; the main body of the hot spring health museum is an arched space frame with a span of 50 meters and a length of 100 meters.

 
Read more

Status: Built
My Role: project manager

 
Hot Spring World Space Frame Roof
Hot Spring World Space Frame Roof
Hot Spring World Space Frame Roof
Hot Spring World Space Frame Roof
Hot Spring World Space Frame Roof
Hot Spring World Space Frame Roof