The Methodist Hospital located in Sugar Land, TX was adding 6th floor to their current facility. Our job with this project was to design, fabricate, and install all millwork, case work, and corian sinks. The 6th floor had 56 patient rooms and 7 nurse stations. In each of those rooms we provided a headwall, a tall cabinet, and a corian sink. My role in this project was to design our millwork based on AWI premium standards. I also scheduled our shipping plans with the installers and the general contractor. This project was under construction for 2 months and was completed August 2011.
Status: Built
Location: Sugar Land, TX, US