Architect: HNTB
My Role: CADD Operator / CADD Manager
I worked closely with the team members and project architect in an attempt to redesign the existing press box, which was severely damaged in the January 1994 Northridge Earthquake. My initial involvement included relocating to the HNTB main office in Kansas City, MO for three weeks to assemble a bid package for the contractor. This project went through many scope changes - from a press box on the first level with two stories of luxury suites above, to what is now presently constructed, a two-story press box. A close-working relationship was established with the State Historical Preservation Society to ensure that minimal existing structure was disturbed or altered.
Status: Built
Location: Los Angeles, CA, US