• ARISTOS STANTON CHASE - 271m2.
• PETRODORADO Energy Ltd. - 400m2.
• DENTAL OFFICE DR. ISAAC WASSERMAN - 50m2.
Responsibilities include Planning, Execution, Monitoring, Control and closure of the project,. Also included, Architectural CAD drawings, Construction Documents, 3D digital study models and Rendering. Other gadgets I had was the preparation of new projects estimates and licenses.
Status: Built
Location: BOGOTA, COLOMBIA