The Cloud No.7 in Stuttgart comprises the Steigenberger Hotel including a terrace bar up to the seventh floor, serviced business apartments from the sixth to the fifteenth floors, and freehold apartments with hotel service and panoramic views of Stuttgart downtown from the sixteenth up to the eighteenth floors.
Tasks:
• Schematic Design and Design Development Phase: design of the facade and design and adjustments of floor plans
• Approval Planning: preparation of documents and plans for permit applications.
• Construction Documents Phase: construction plans in Scale 1:50 and detail plans in Scale 1:20 to 1:5
• Bidding Phase: preparation of drawings, notes, and technical specifications necessary for bidding
• Construction Administration Phase: administration of the construction process, site visits and documentation thereof by function, fireproofing and handicapped use, coordinating and preparing permit drawings, drafting and constructing details such as facade and window details, parapets, drainage, wall to floor connections, etc. and area calculations
Status: Built
Location: Stuttgart, DE
My Role: Junior Architect
Additional Credits: Landscape Architecture: GTL Landschaftsarchitekten, Interior Architecture: Geplan Design