Archinect
Peter Purificacion

Peter Purificacion

San Leandro, CA, US

 
View Portfolio

About 

Employment 

primestudio, San Leandro, CA, US, Project Manager

1. Prepares the Architectural services As-built surveys, Interior Design and Planning.
2. Prepare complete set of construction documents/working drawings to local agencies for review.
3. Interpret local Building Code and ADA requirements.
4. Attend Building and Planning Department during the permit approval process.

Jul 2009 - current
 

HY Architects, Oakland, CA, US, Job Captain

1. Prepare Design Development package with Architect direction
and prepare the complete construction documentations
2. Responsible for coordination with various trades/consultant and
through Construction Documents.
3. Prepare and research product specifications for specific projects.
4. Prepare close out documents for clients records.

May 2005 - May 2009
 

HILL GLAZIER Architects, Palo Alto Ca, US, Job Captain

1. Assist Architects in preparing design Development and construction Document package. and Prepare material board for client review
2. Responsible for designating work assignment with technical staff’s
3. Assist in preparing project specifications
4. Assist in Sketching details for the projects

Apr 2003 - Mar 2005
 

DES Architects + Engineers, Redwood City, CA, US, Job Captain

1. Assist Architects in preparing design Development and construction Document package
2. Responsible for designating work assignment with technical staff
3. Assist in preparing project specifications

Sep 2000 - Feb 2003
 

THGI Architects, Los Gatos, CA, US, Job Captain

1. Assist Architects in preparing design Development and construction Document package
2. Responsible in preparing the construction document package and specifications
3. Assist Architects in attending design/construction meetings
4. Interface with local agencies for permit applications

Jul 1998 - Jul 2000
 

Kajima Overseas Asia Pte. Ltd., Singapore, SG, Project Coordinator

1. Represent the General contractor in house review of Architectural Structural and M.E.P.
construction Documents with Consultant and Inspector for the project,
2. Coordinate specifications and it's site application, a visit to manufacturer plant to ensure quality on
its production process for the following projects: Ikea Singapore, Orchard Redevelopment Project,
and assist in the selection of Exterior cladding for Petrona's Tower .

Mar 1993 - Jul 1997
 

Al Hejailan DMJM Consultant, Riyadh Saudi Arabia, Site Architects

1. Review construction progress and facilitate monthly Inspections for King Fahd Medical City Projects consist of 510 bed general hospital, 217 bed pediatric, 254 Maternity and 300 bed Psychiatric hospital with 2,561 staff housing and other public utilities and ancillary buildings.

2. In-Charge of Facilitating Bi-weekly meeting with General Contractor and with client / Owner Ministry of Health

Oct 1987 - May 1993
 

Areas of Specialization