Benson, Long Beach, CA, US, On-site Project Coordinator
Provider of design, engineering, supply and installation of curtain wall, tension wall and external cladding. The Long Beach Court House project is the first public-private partnership in The United States with a total budget of $480 millions.
Achievements
- Organized and standardized job site administrative tasks through creation of checklists, follow-up documents and flow-charts.
- Verified and documented curtain wall and tension wall integrity discrepancies.
Responsibilities
- Managed daily reports and administrative paperwork.
- Time scheduled for payroll and subcontractors.
- Initiated, verified and processed purchase orders, change orders and invoices.
- Verified shipments and deliveries to the job site.
Snc Lavalin O&M, Montreal, QC, CA, Project Coordinator
Division of SNC Lavalin Inc. specialized in Remodel and Construction Projects for offices, laboratories, a shooting range, and residences. Projects ranged from $10K to $2M CAN.
Achievements:
-Completed 19 projects per year on time and budget.
-Promoted after 18 months from the position of CAD coordinator.
Responsibilities:
- Provided Quality control for compliance to federal and regional safety laws and regulations.
- Prepared scope of work, technical specifications, preliminary schedule, and budget (type D) for consultants.
- Prepared contractor bid packages and upon receipt, analyzed it for adherence to design, quantities, qualifications, and costs as compared to preliminary analysis and budget
- Controlled and monitored the schedule and budget through ERP SAP Tririga, Excel and Ms Project.
- Participated in project kickoff meetings, weekly and monthly project meeting, and monthly
project report out reviews as well as project closeout lessons learned.
- Coordinated with clients, users, technical teams, contractors, subcontractors.
- Updated the building’s master plans through archive research and on-site verification layout.
- Developed a classification system for old and new projects.
Consortium Waters of Curumuy, Piura, PE, Consulting Architect – Team Leader
The Joint venture was responsible for the construction of a Water treatment plant for the city of Piura. The budget for this project was $40 Million US$ (global). We were responsible for Conception through the beginning of Construction. The Architecture team was conformed for two Architects and six designers.
Achievements:
- The conception phase was finish on time and budget.
- Government approval of conception phase granted without observations.
Responsibilities:
- Managed the architecture team as part of a multidisciplinary project.
- Project leader of architecture team
- Represented architecture team in the coordination meetings with the working team of Ecuador, the other specialities of engineering and business oversight.
- Negotiated and won the award of contracts with suppliers.
- Estimated activities and developed the schedule.
- Estimated costs and determined the budget.
- Prepared sketches and models and supported in the design of plans (Auto-CAD)
- Developed architectural details.
Enterprise Engineering, Technology and Development (ITDSAC), Piura La Vieja, PE, Consulting Architect
Company was responsible for the Remodelling of the facilities for Talara refinery which the 2nd biggest refinery in Peru. We were a team of three engineers, one architect, and two designers.
Responsibilities:
- Compiled and created the safety protocol for demolition project.
- Coordinated multidisciplinary teams in projects of government buildings.
- Estimated activities and developed the schedule.
- Estimated costs and determined the budget.
- Quality control overseeing budget and schedule.
- Prepared sketches and models and supported in the design of plans (Auto-CAD )
- Developed architectural details.