Architect with over 19 years of experience working on a variety of interior design and architectural projects: corporate interiors, residential, hospitality, retail, healthcare, public / private schools, mixed-use / high-rise projects in the tri-state area and abroad. A valuable member of award-winning companies such as: HLW, Costas Kondylis and Partners, Gensler, Ted Moudis, Rockwell Group, and AECOM. Extensive experience with on-site, quality control, and construction administration. Proficiency in all phases of design development and filing requirements. Strong construction details knowledge, communication skills, organized, motivated, leadership abilities, familiar with all discipline’s coordination, cost estimation, specifications, submittals / shop drawings revision. New York State architecture license completion expected for 2025. Licensed architect in Brazil. LEED Green Associate.
DDC - Department of Design and Construction, New York, NY, US, Senior Design Project Manager
Queens Library Unit. Overseeing allocation of resources, ensuring timely delivery of projects and achievement of the yearly project and budget commitment plans. Planning and monitoring projects to meet the agency's objectives and milestones. Preparation of certificate to proceed (CP) requests and amended CP requests. Preparation of funding request and task orders (TO). Coordination of pre-design with A&E and front-end planning unit. Coordination of schematic design, design development, and construction document design, during design review phases. Bid package preparation and coordination with other units. Development of monthly report and IFA management.
Projects: Queens Village Community Library, Richmond Hill Branch Library, Queens Central Library, Douglaston Library, Rego Park Library, Broadway Library renovation, Astoria Library renovation.
ABeam Studio, LLC, White Plains, NY, US, Principal
Initial site assessment and land feasibility. Site surveys, building code analysis IBC, DOH, and NYC codes (fenestration, envelop, energy code, egress, fixture counts, path of travel, ADA, etc), assist with preparation of budget, scope, drawings, and specifications. Design development and design fittings for multiple projects in retail, corporate, and hospitality. Coordination with clients, landlord, and MEP. Punch list inspection, compilation, and distribution. Development of AutoCAD office standards, project files structure, and CTB settings. Response to BID packaging, RFI’s, site inspections and layout approvals, coordinate revisions, bulletins and addenda, review shop drawings and submittals. QAQC reviewer of construction set, coordination with code compliance and constructability. Delegate tasks to Drafter, coordination with team to create a pleasant work environment.
Projects: Filmmaking studio (2500sf - $1.2M) - Retail store (1500sf - $300K) – Real estate office renovation (1500sf - $200K) retail building addition (1200sf - $200K), single family (3000sf - $6m), Residential Triplex (7000sf - $3M), New Building (12,000sf - $4m), Residential Condo single family and buildings 200ac - $80M
DDC - Department of Design and Construction, New York, NY, US, Senior Design Project Manager
One NYC Energy and Health Unit. Oversaw allocation of resources, ensuring timely delivery of projects and achievement of the yearly project and budget commitment plans. Planned and monitored projects to meet the agency's objectives and milestones. Prepared certificate to proceed (CP) requests and amended CP requests. Preparation of funding request and task orders (TO). Coordination of pre-design with A&E and front- end planning unit. Coordination of schematic design, design development, and construction document design, during the design review phases. Bid package preparation and coordination with other units.
Projects: Brooklyn Library, Roy Wilkens Recreation Center, 84th Precinct, Sun Building, OEM Building, Marriage Building.
DDC - Department of Design and Construction, New York, NY, US, Senior Construction Project Manager
One NYC Energy and Health Unit. Oversaw allocation of resources, ensuring timely delivery of projects and achievement of the yearly project and budget commitment plans Planned and monitored projects to meet the agency's objectives and milestones. Monitored the lifecycle of projects, solved field conflict problems with architects and engineers. Interacted with various agencies and stakeholders. Considerable interaction with senior-level management. Processing payments and review of work schedule and from NTP to closeout. Site safety monitoring and record-keeping of daily work tasks and labor allocation.
Projects: Manhattan Supreme Court, 84th Precinct, Sun Building, OEM Building.
HLW International, New York, NY, Consultant Architect
• Schematic Design, Design Development and Construction Documents, Site Surveys and Building Code Coordination experience. Coordination meetings with multiple trades consultants and client.
• Projects: Guggenheim Asset Management, NY (30,025 sf – Budget $500,000); Omnicom, NY; A&E Television Networks, NY (20,000 sf); United Nations Complex (840,000 sf – Budget undisclosed), NY; Hilton Hotel, Short Hills Spa (11,500 sf – Budget$ 600,000).
AECOM, New York, Design Project Manager - Consultant
Project Manager /Construction Administration
• Site survey and documentation, general site code review (egress, fixture counts, path of travel and ADA), assist with preparation of budget scope drawings and specifications, technical coordination with design team, full construction documentation including technical detailing and specifications, redline review of construction documents, attendance to project meetings and conference calls. Coordination with clients, landlord, and MEP. Punch list inspection, compilation and distribution. Assistance in project closeout documentation, CM13 submittals log and control, RFI’s, meeting minutes, bulletin reports. DOB (BCC) filing, including all forms and follow up of objections for final approval with plan examiner and cost estimates. Development of AutoCAD office standards, project files structure and CTB settings. Response to questions from bidders, site inspections and layout approvals, coordinate revisions, bulletins and addenda, review shop drawings and submittals.
• Projects: PS31Q – PA System and FA (78,000sf - $1.2M), PS198M - Flood Remediation (150,000sf - $1.6M), PS39K - PA System (40,000 sf- $ 800,000), Eagle Academy for Young Man – Complete Building renovation (75,000sf - $3M), IS 218M – Windows replacement, George Washington HS – Pool Renovation, (286,000 sf - $1M), PS36R – Boiler replacement ($4.5M), PS12Q – Boiler replacement ($3M), Graphics HS – Boiler replacement ($6M), PS446M – Fire Alarm upgrade ($3M), JFK HS – Emergency remediation (8M).
RMJM Hillier, New York, NY, US, Consultant Architect
• Development of BID and CD. Responsible for structural, MEP and site coordination. Development of millwork and construction details, set revision, graphics and Cad Standards coordination.
• Project: Cancer Center located in Porto Rico (286,000 sf-$106,000,000).
Jeffrey Jordan Architect,, Osinnining, Project Manager
• Project management experience, covering all phases of design from SD thru CA. Experience in the coordination of construction documents, project planning and scheduling. Extensive knowledge in construction detailing. Schematic design development, design development, space planning development, DOB documents, Construction Documents, MEP and structural coordination. Site survey, building code coordination, ADA requirements implemented to the design. Development of AutoCAD office standards, project files structure and CTB settings.
• Projects: Trevor Day School (55,000sf – $5,000,000); Hoss Intropia vendor space at Bloomingdales Soho and VA.
Macrae-Gibson Architects, New York, NY, Project manager
• Schematic Design, Design Development, DOB, Construction Documents, Coordination With structural, MEP, and architectural experience. Site surveys, building code coordination. Coordination of USGBC LEED requirements. Coordination meetings with consultants and client. Construction administration including Progress meetings, pre-construction meetings with FID inspectors, PO, GC, and client. Development of preliminary construction schedule, meeting minutes, RFI’s responses, bulletins for SCA standards, and Expedition.
• Projects: PS 196 (34,000 sf – Budget $2,980,000), IS 181X (195,470 sf – Budget $5.2million), PS 153 X (137,853 sf Budget $690,000), Truman Site work, PS 166M (15,000 sf of roof work, $1.9million), PS 70 X (Budget $3.4milion), Truman HS Pool Upgrade (Budget $9.2milion).
• Field rep. for projects – Jill Chaifetz Transfer High School (24,180 sf – Budget $8.6milion), Truman High School, and PS196.
USGBC, BArch, LEED-GA
Faculdade Metodista Bennett, Rio de Janeiro, BR, BArch, Architecture and Urbanism
EDUCATION: Bachelor in Architecture, Faculdade Metodista Bennett (Bennett Methodist University), Rio de Janeiro, Brazil (1998 – 2003).