Archinect
Caesar Rubio

Caesar Rubio

Reseda, CA, US

 

About 

Seasonal professional in the field of architecture.

Employment 

CR Architectural Consulting, Las Vegas, NV, US, Owner

Contracting Commercial, Hospitality, and Residential Architectural Tenants Improvements Projects in Las Vegas, NV & California, Texas, Alabama, and Virginia.

Jan 2009 - current
 

Klai Juba Architects, Las Vegas, NV, US, Architectural Development

General Architectural project development.
Concocted tenant’s improvements project documents from start to finish.
Coordinated construction drawings and specifications with the building department for construction permit requests.
Coordinated with project owners, consultants, and contractors architectural projects.
Translated design drawings into construction documents.
Prepared, coordinated, and reviewed construction documents for zoning ordinances, building codes analysis, and ADA requirements.
Carried out project field visits for inspections, inventory, and space analysis for future tenant’s improvements.
Provided CAD computer support.

Mar 2008 - Aug 2008
 

JMA Architecture Studios, Las Vegas, NV, US, Project Professional VII

Worked on Hospitality, Commercial, and Educational Studios.
Translated architectural design drawings into construction documents.
Coordinated in detail construction documents for building permit requests.
Planned the architectural production aspects for finished plans, specifications, and approved materials for construction.
Prepared, coordinated, and reviewed zoning ordinances, building codes analysis and ADA requirements for building projects.
Communicated with project owners, consultants, and contractors to follow-up information and required construction procedures.
Performed construction administration duties, made project field visits, prepared contractor correspondence, reviewed shop drawings, submittals, punch list, and responded to contractor request for information.

Apr 2005 - Mar 2008
 

Wynn Design and Development, Las Vegas, Las Vegas, NV, US, Architect Intern

Part of the production and design team for Wynn Las Vegas Resort.
Responsible for design and production of construction documents.
Developed and refine schematic design drawings.
Developed construction details.
Revised architectural shop drawings and consultant submittals.
Worked in master exiting plans.
Maintained a close document checking & coordination and research for specifications and construction materials.
Observed the progress of project’s physical construction to relay problems and corrections required.
Executed “Punch List” of completed phases of the project.

May 2001 - Apr 2005
 

Las Vegas Valley Water District, Las Vegas, NV, US, Intern

CAD computer operator.
Drafted construction schematic drawings, scanned blue prints, and performed general office duties.
Examined new water connections plans.

Jun 1999 - May 2001
 

Education 

University of Nevada, Las Vegas, Las Vegas, NV, US, BArch, Architecture

Architectural Design and Building Science

Jan 1998 - May 2002
 

Areas of Specialization