Adress : Al-aylafun, Plot 114, Block 08, Khartoum, Sudan
Mobile + 249-9-15231782
+ 249-123001823
E-mail : optionengineering@gmail.com
Mohamed Mustafa Mohamed Osman Mustafana
Objective To be Professionally Associated with a Dynamic Organization Utilizing the Experience gained so far and Improves Further to Achieve the Target in an Efficient Manner.
Professional Experience
2010 – 2011
Sudan Government of National Unity - Multi Donor Trust Fund
Decentralized Health System Development Project (DHSDP)
• Projects:
Establishment & Rehabilitation of Kassala Midwifery School
- Rehabilitation the Water Supply Network
- General Rehabilitation the existing Buildings
- Rehabilitation the laundry
- Rehabilitation the Delivery Unit
- Rehabilitation the existing kitchen to use Reception
- Construction of New Block (ground floor)
- Construction of New Block (1st floor)
- Construction of Kitchen & Dinning Area
- Construction of Central Store
- Construction of Praying Area
Telkouk Hospital – kassala State
- Telkouk Hospital - Theater New extension Work
- Telkouk Hospital - Theater Rehabilitation Work
- Telkouk Hospital - Delivery Unit Rehabilitation Work
- Telkouk Hospital - Ward Rehabilitation Work
The Medical Sciences academy – Kssala State
- The Main Reception
- Seminar Hall
- Cafeteria
- Dinning hall
- Eastern storage room
- Northern storage room
- Public toilets
- External fence
- Management Building (Three multi stories )
- Lectures Building (Three multi stories )
Incinerators Projects – Kssala State
- Maman Medical Unit
- Tahajer Medical Unit
- Darasta Medical Unit
- Jebel Habouba Medical Unit
- Aroma Medical Unit
- Makaly Medical Unit
- Digain Medical Unit
- Tindely Medical Unit
- Matataib Medical Unit
- Olaib Medical Unit
- Shalaki Medical Unit
- Al-Jeera Medical Unit
- Al-Adergawy Medical Unit
Position: Consultant
Activities
Documentation Full set of drawings + BoQs
Provide additional details if required
Preliminary Site Visit before commencement
Quality Control of materials and workmanship
- Sand
- Aggregate/ Stone
- Cement
- Bricks/ Concrete Blocks
- Mortar + Concrete + Plaster Mix
- Steel Reinforcement
- Doors and Windows
- Roofing Jack arch/ Truss/ Concrete Slab
- Pavior works Tiles – terrazzo, ceramic + porcelain
- Painting
- Electrical
- Plumbing
Architectural, Infrastructure Design & Consultancy
Construction supervision & Planning
Preparing Architectural & Structural Drawings & Reports
Buildings Quantities and Cost Analysis
Project supervision, Project Management
Site Visits
- General Specific MWTS daily
- Hospitals min 3 x per week
- Handover of site
- Approval of setting out
- Approval of foundation excavation
- Casting of foundations
- Inspection before casting floor slab
- Casting of floor slabs
- Inspection of ring beams before roofing
- Roofing
- Continuous Control finishing and workmanship
Programme and monitoring of Progress
- Samples programmes
- New Construction
- Rehabilitation
Meetings Minutes of all meetings to be circulated.
- Weekly Meetings on site with the Contractor
- Monthly Meetings with MOH State project Coordinator (SPIU) and the Contractor.
Measurement and Preparation of Valuations
- All Contracts Measured Submit valuations according to the BoQs and Contract on a monthly basis.
Reporting
Daily prepared with the contractor to record General information and weather Record of manpower + equipment on site Work done Record of delays and any recommendations
Weekly Prepared by the supervisor. Brief report including Work done Record of resources manpower + equipment Any delays and recommendations.
Monthly Report to include:
º Description of activities
º Any changes to scope of work or drawings and additional work approved by DHSDP
º Summary of Manpower, Material + Equipment on site
º Review of programme / progress
º Material testing information.
º Minutes of meetings with Contractor and Client
º Payment status
º Progress Photographs
º Updated progress chart
2006 – Present
Center for Engineering & Technical Studies (CETS)
Khartoum, Sudan
• Projects:
Khartoum international air port ( KNIA ) _ Pricing & Billing
Military Hospital Main Tower (12 stories) _ Design
Military Hospital, Surgery Tower (12 stories) _ Design
Military Hospital (5 stories) _ Design
Military Hospital, Albagdadi Tower (12storeis) _ Design
Veterinary Training Building, Umdurman_ Design
Serkees Villa, Garden city_ Design
Umbayada Irrigation Project, Western region_ Design
Dams Implementation Unit, Merowe Irrigation Project
Semex Factory Pump Station_ Design
Position: Consulting Architect, CAD & GIS Expert, Instructor
Activities
Architectural, Infrastructure Design & Consultancy
Construction supervision & Planning
Preparing Architectural & Structural Drawings & Reports
Buildings Quantities and Cost Analysis
Professional AutoCAD & Arc GIS Advisor
Project supervision, Project Management, AutoCAD,
Arc GIS, ArchiCAD, 3dmax and Primavera Instructor
2005 – 2006
Lahmeyer International, Bad Vilbel – Germany
Khartoum, Sudan
Project: Dams Implementation Unit, Merowe Irrigation Project
Position: CAD Engineer
Activities
Designing & preparing Structural Drawings for Conveyors (Canals).
Designing & preparing Structural Drawings for Road Bridges.
Designing & preparing Structural Drawings for Foot Bridges.
Designing & preparing Structural Drawings for Cross Regulators.
Designing & preparing Structural Drawings for Side Spill.
Designing & preparing Structural Drawings for Drop Structure.
Designing & preparing Structural Drawings for Box Culvert.
Designing & preparing Site location plans Including Contours And GIS Images.
2004 – 2005 Tedal Engineering Khartoum, Sudan
Project: Sudan TV and Radio Corporation
Position: Project Manager
Activities
Site Management
Construction supervision
Site Planning
Material Controlling
Cost Analysis
Time Controlling
2001 – 2004 Al-Turath Foundation Riyadh,Madina,KSA
Project: Higaz Railways Station, Madina
Project Cost: 30,000,000 Saudi Riyals
Position: Project Quantity Surveyor
Activities
Construction supervision
Site Planning and Surveying
Making Measurement of all Construction activities
Making Measurement of Subcontractors jobs
Preparing drawings by AutoCAD
Take off Quantities
Making Bills of Quantities
Take the Consultant Approval for finished Quantities
Making Cost Analysis
Checking Materials quality and specifications
Advise Purchasing Department
1997- 2001 Saudi Al-Amar Company Riyadh,Madina,KSA
Project: Marketing, Manufacturing, Exporting and Importing of Construction Materials
Position: Sales and Marketing Engineer
Activities
Construction Materials Marketing and distribution
Designing special types of fixing , lifting & Precast Concrete accessories
Purchasing and reselling Construction Materials
Preparing workshop drawings by AutoCAD
Preparing Quotations & follow-up Customers
Cash and check collection
Marketing Evaluation, Analyzing and Predicting
1997 – 1997 Khaldia Auditorium Factory Riyadh, KSA
Position: Site Engineer
Activities
Designing of Auditoriums, Theaters & Halls
Preparing workshop drawings for Construction by AutoCAD
Preparing Material quantities for Auditoriums, Theaters & Halls
Site Supervision of Auditorium, Theaters & Halls Projects
1994 – 1997 Ministry of Engineering Affairs Khartoum, Sudan
Project: Department of Public Utilities and Planning
Position: Public Utilities and Planning Engineer
Activities
Designing of Residence Buildings
Preparing workshop drawings for Construction by AutoCAD
Construction Supervision of Multi-story Buildings
Renovation and Maintenance of Government Buildings
Buildings Quantities and Cost Analysis
Surveying and Measurement of Existing Buildings
Checking Drawing for Construction Permissions
Checking Under Construction sites and matching the drawings
Summary of Qualifications 1994 – Present
Free lance
Khartoum, Sudan
• Projects:
Comoros vocational Institute, Moroni Island_Design
Maka Medical center west region _ Design
Kasala Mazad Mosque _ Design
Police Mosque, Abu_Irooq_Design
Al_Izairig Mosque,Al,aylafun_Design
Zedabi building (4stories) _Design
Issam Aldaw House, Omduman_Design
Nyala Mortuary_Design
Police Hospital ,Nile state_Design
Gusia Co Multiple Villas _ Design
Patients & VIP Waiting Hall, Shab Hospital _Design
Conference Hall, Nahr Alnil Staten _Design
Sidco Furniture Factory, Sudan _Design
Too many Villas & Load bearing buildings _Design Supervision _Construction
October 1994
Sudan University of Science and Technology, Khartoum, Sudan
College of Engineering
Three Years Diploma
Department of Architecture
December 2011
Emirates College of Technology, Khartoum, Sudan
Bachelor of Architecture & Planning (BSC Honors)
Department of Architecture & Planning
Professional Membership
Sudanese Engineering Council
Sudanese Real state Agencies Association
Courses
Project Management Professional (PMP), PMI, Sites Power, Dubai
Performance Improvement in Management (Management Development Center), Khartoum
German Language Course, Goethe Institute, Khartoum, Sudan
Computer Courses, Khartoum, Sudan:
1. Microsoft Windows
2. Microsoft Office
3. AutoCAD
4. Primavera Project Planner P3
5. Microsoft Management
6. PhotoShop
7. 3Dstudio Max
8. Arch cad
9. Arc GIS
Personal Information
Nationality: Sudanese
Date & Place of Birth: Sudan, 31st December 1971
Religion: Islam
Marital status: Married
Languages: Arabic ( Mother tong ), English ( speak, read & write )
Special skills: Computer Maintenance,
Reference
DR. Abdullah Shigidi # 249-912305529
Eng. Hashim Mohamed Abdulmutalib # 249-912215343
Eng. Adil Rahmatallah # 249-918074666
Lahmeyer InternationalLahmeyer International, Khartoum, SD, Cad Engineer
Structural CAD Engineer ( Irrigation Structures Design)
Project: Dams Implementation Unit, Merowe Irrigation Project
Tender Design and documentation
Project Cost: 550,000,000 Euro
Emirates College of Technology, Khartoum, Sudan, Khartoum, SD, BArch, Architecture & Planning
Bachelor of Architecture & Planning (BSC Honors)
Department of Architecture & Planning
Sudan University of Science and Technology, Khartoum, Sudan, Khartoum, SD, Architecture
Three Years Diploma
Department of Architecture