Woods Bagot, Sydney, AU, Designer

2nd In Charge; on the delivery of the “Metro Box” portion of the Major Works to Sydney Central Station.
Woods Bagot with Laing O’Rourke and Aurecon won the Design Competition to re-design and deliver the upgrade works to Sydney Central Railway Station.
The Metro Box is the only portion of the Major Works that is an entirely New Build and does not interface with the existing building. The Metro Box consists of two levels; the concourse level that connects to the existing concourse, and from this level passengers ascend almost 20 metres to a new platform below.
I am part of a small team working to deliver this design package. I work in Revit on a daily basis; and I am involved in all levels of coordination with the team of engineers and the client group Transport for NSW, Sydney Trains and Sydney Metro Group.

May 2018 - current
 

Scott Carver, Sydney, AU, Graduate Architect

Over 3 years with Scott Carver my role progressed from architectural assistant, to 2nd in charge, to the lead designer and running my own projects (with guidance).
i worked on the revit documentation for a number of apartment building development applications.
My natural skills in communication have guided me into roles that focus on coordination as well as relationship building with clients.

Sep 2015 - May 2018
 

PTW, Sydney, AU, Graduate Architect

I worked in a small team on the revit documentation (for tender) for two 23 story towers designed by foster and partners.
I became a key point of contact within the team for all coordination with external consultants.

After this project i also worked on a number of design competitions, for mixed-use/multi residential developments.
I also worked closely with the business development team , submitting Request for Tender, Expression of Interest documents for winning new work.
I have developed an ability to perform tasks within a controlled time period based on the project fee, scope, and having an awareness of the cost of my time.

Sep 2014 - Sep 2015
 

Dickson Rothschilde, Sydney, AU, Graduate Architect

Within this role I worked with a team on the lodgement of development applications for residential flat buildings, predominantly within Sydney’s western suburbs. I was involved on projects from their preliminary stages, and at each stage of their design development through to development application. I completed yield assessment tasks for clients, site analysis studies, cross ventilation, solar access and conceptual master planning strategy diagrams. Using AutoCAD, I completed mark ups to plan, elevation and section architectural drawings. I used Adobe Photoshop for colour elevation architecturals, as well as Adobe Illustrator and Indesign for other graphic/diagram presentation tasks.
I gained a thorough understanding of council controls, in particular of the Residential Flat Design Controls; I completed two SEPP 65 reports for two separate development applications. I was also involved in the writing of SEE reports.
Between January and March this year the Practice Director of this firm had been engaged by solicitors to provide an Affidavit of his Expert Opinion on a court case relating to the architectural services of a third-party architect; I worked on this court case as a research assistant, tracing evidence of malpractice.

Jan 2014 - Sep 2014
 

Education 

University of Technology Sydney (UTS), Sydney, AU, MArch, Architecture

Jan 2012 - Mar 2014
 

University of Canberra, Canberra, AU, BArch, Arts in Architecture

Jan 2009 - Mar 2012
 

Skills