I have recently graduated from MArch (RIBA Part II) MSc Computing & Design from University of East London.
In addition to my MArch, I studied MSc which has deepened my understanding and knowledge in the use of computation in architecture and in particular scripting and parametric design.I have excellent knowledge of CAD and SketchUp and have been using both softwares for more than 6 years.
For my 5th year project I proposed a regeneration Masterplan for The Nightingale Estate in Hackney. During this project I studied the regulations for residential designs. My project aimed at re introducing the historic routes that existed in the area.
Peer Gallery, London UK, Coordinator
Worked as part of the design and build team to create a “Social Condenser”, for the
Real Estates exhibition at The PEER gallery in London. During this project I was
involved in all the different stages of the project including the design, construction,
installation and presentation. My main role was to coordinating a small team of
students in maintaining high levels of detail and accuracy during the construction
phase. Making decisions on the colour scheme, material choice, assembly method
and Co-coordinating the build with the Curator in order to meet the show’s opening
deadline.
Currys PC World, Leicester / London UK, Supervisor
My Responsibilities included solving customer complaints, suggesting solutions and
alternative products that where suitable for the customer’s needs. My main duties
consisted of diagnosing faults with products and resolving customer issue in line
with strict customer service protocol and maintaining high levels of customer care at
all time.
Hans Haenlein Architects, London UK, Architectural Assistant
Worked alongside the architect inside and on site, this included visiting new and
existing project sites and attending clients meetings. My main responsibilities
included working on the 3D models of new and existing projects for planning
permission and presentations.
VBC Building Contractors,, London UK, Project Manager Assistant
Coordinating day to day tasks, which included ordering materials and arranging for
machinery to come on site. Here I worked on AutoCAD to produce plans and
sections in preparation for the planning application.
University of East London, London, GB, MArch, Architecture Part II (RIBA) & MSc Computing & design
De Montfort University, Leicester, London, GB, BArch, Architecture Part I (RIBA)
Wright brothers plane challenge, 2nd Place
Runner up in the Wright brothers plane challenge, the task of the competition was to build a model plane that could sustain flight for the longest time