Archinect
Eduardo Marques

Eduardo Marques

Jersey City, NJ, US

 

About 

I am an accomplished designer with over 14 years of experience including 6 years of focused experience in Hospitality and Retail Interiors along with additional experience working with architects and artists.  I have developed an aptitude at complex problem solving and working with a team to take a project from original concept to reality.  My areas of expertise include concept design, project management, construction administration, 3D modeling and complex/digital fabrication. 

Employment 

nemaworkshop, New York, NY, US, Senior Project Manager

selected projects:

The Smith - Nomad, NYC , 2014, completed 2016
Position; Project Manager (Construction Administration).

The Smith - F Street, Washington D.C 2015, completed 2016 .
Position; Project Manager (Concept design, design development).

The Smith - U Street, Washington D.C. , 2016 currently in bid.
Position; Project Manager (Concept design)..

The Smith - Chicago, 2017 currently in concept phase.
Position; Project Manager (Concept design).

W Hotel Aspen, CO, 2014, currently under construction.
Position; Project Manager (Concept design, Design Development).

W Downtown LA, 2016, currently in concept phase.
Position; Project Manager (Concept design).

Empire Diner, NYC, 2016, completed 2017
Position; Project Manager (Concept design through Construction
Administration).

Nur, NYC, 2016, completed 2017
Position; Project Manager (Concept design through Construction
Administration).

Padoca, NYC, 2014, completed 2015.
Position; Project Manager (Concept design through Construction
Administration).

Boutique Hotel, Savannah, GA, 2016 currently under construction.
Position; Project Manager (Concept design through Construction Administration).

Izzy’s Pizzeria, Edgewater, NJ, 2016, completed June 2017.
Position; Project Manager (Concept design through Construction Administration).

G Residence, NYC, 2015, currently under construction.
Position; Project Manager (Concept design through Construction Administration, specifications).

Kuppi; Edgewater, NJ, 2014, completed 2015
Position; Project Manager (concept design, Construction Drawings).

W Hotel; Shenyang, China, 2014, currently on hold.
Position; Designer , Ballroom, Project Manager herein ( concept design, 3D modeling, CAD, Design Development Drawings).

La Pecora Bianca; New York, NY, USA, 2014, completed 2015
Position; Project Manager ( concept design, CAD, Construction Drawings, specs).

Nov 2014 - Jan 2017
 

Glen and Company Architecture, New York, NY, US, Designer/Project Manager

Selected projects:

Crowne Plaza Hotel W36th St; New York, NY, USA, 2014.
Position; Designer, lobby spaces (concept design, 3D modeling, CAD, Construction Drawings). Currently under construction.

NYLO Hotel; Nyack, NY, USA, 2014.
Position; Designer, lobby/public spaces (concept design CAD, Construction Drawings, specs). Currently under construction.

Apr 2014 - Oct 2014
 

The Rockwell Group, New York, NY, US, Architectural Designer/Project Manager

Selected projects:

OTG Newark Terminal C F&B Spaces; Newark, NJ, USA, 2014.
Position; Designer (Phase 1 concept design). Completed April, 2014

Editions Abu Dhabi; Abu Dhabi, UAE, 2011 - present.
Position; Designer(design development, 3D rendering, construction documents). Currently on hold.

Bloomingdale’s Glendale; Glendale, CA, USA, 2012 - 2013.
Position; Designer (concept design, design development, construction documents). Completed 2013.

Hangzhou Retail Center; Hangzhou, China, 2011 - present.
Position; Designer (concept design). On going.

May 2011 - Mar 2014
 

Freelancer, New York, NY, US, Architectural Designer/Fabrication Consultant

Selected projects:
Unire/Unite (YAP@ MAXXI Rome); Rome Italy 2012.
Urban Movement Design; www.urbanmovementdesign.com
Services rendered: project management, design, material studies, construction documents. Completed 2012.

Bag Pile (PS 1 Warm Up competition entry); Queens, NY 2011.
FormlessFinder; www.formlessfinder.com
Services rendered: design, material studies and sound piece (competition entry) unbuilt.

Vancouver 2010 Olympic Village Street Furniture; Whistler, Canada.
Urban Movement Design; www.urbanmovementdesign.com
Services rendered: 3D modeling/digital fabrication consultant, design, construction administration, Completed 2010.

Couch for a Disabled Couple, USA 2009 - present.
Urban Movement Design; www.urbanmovementdesign.com
Services rendered: Design/3D Modeling/Digital Fabrication Consultant, design. Unbuilt.

Newspaper Sculpture 2010
Kelley Walker Studio
Services rendered: Design/3D Modeling/Rendering/ Fabrication, Material Consultant (developed new material with foundry). Unbuilt.

Apr 2009 - May 2011
 

Acconci Studio, New York, NY, US, Architectural Designer/Project Manager

Selected projects:

Public Art for Waterpark City; Toronto, Canada, 2005 - present.
Position; Project Manager(schematic design through construction administration). Completed 2011

Linear Building Up in The Trees; Anyang, South Korea. 2005 - present
Position; Project Manager(schematic design, 3D rendering, design development, construction administration). Completed 2007

Façade Over a Façade; Milan, Italy. 2004 - 2007
Position; Project Manager(schematic design through design development, prototyping). Unbuilt.

Jan 2004 - Mar 2009
 

Freelancer, New York, NY, US, Architectural Designer/Renderer

Clients included Boum Design, NOMAD Design and others.

May 2003 - Jan 2004
 

Boum Design, New York, NY, US, Architectural Designer

Architectural Designer for a variety of projects including architecture and product design.

May 2002 - Oct 2002
 

ArX New York, New York, NY, US, Intern

Jun 2000 - Sep 2001
 

Education 

Pratt Institute, Brooklyn, NY, US, BArch, Architecture

Sep 1998 - May 2003
 

Areas of Specialization 

Skills