Archinect
Alexander Kim

Alexander Kim

Somerset, NJ, US

 

About 

Since graduating from Syracuse University School of Architecture [Cum Laude] in 2009, Alexander has over ten years of professional experience.  He has led the design of, produced full drawing sets and managed numerous mixed-use, hospitality, commercial, institutional and residential projects, from the concept/schematic phase all the way to construction in the United States, China, South Korea, Saudi Arabia and Qatar.  The invaluable skills and insights he gained from his experiences at Kohn Pedersen Fox, Gensler, GLUCK+, RAFT Architects, Imrey Studio and Studio Hillier have crafted his design approach as well as his attention to details.

Some notable projects that Alexander has contributed on include PS376Q, a brand new New York City primary school located in Bayside, Queens, NY, and the iconic CTF Finance Centre, a 530m mixed-use supertall tower in Guangzhou, China.  The CTF Finance Centre complex will be the anchor of Guangzhou’s emerging CBD and the tallest, most programmatically integrated skyscraper in the city.  Both projects were completed in 2017.

Currently, Alexander is designing and managing a 350,000 GSF mixed-use project in Jersey City in conjunction with NJCU, the Joffrey Ballet and Strategic Development Group called the Center for Music, Dance, Theatre and University Performing Arts Center. The building will be the new center of a larger master plan called University Place. The mixed-use building is comprised of a few components: 343 residential units, 3 restaurants, new rehearsal spaces, classrooms, and offices for NJCU's Music, Dance and Theatre program, a 100 seat recital hall, and a 490 seat theater with support spaces and dance studios. Construction is scheduled to start Fall 2019.

Alexander is married to his wife, Emily, and father to two beautiful children, Olivia and Noah, and their dog, Milo.

Employment 

Studio Hillier, Princeton, NJ, US, Senior Designer

Center for Music, Dance, Theatre + University Performing Arts Center - Jersey City, New Jersey
Program: Mixed-Use/Multi-family Residential/Cultural
Client: Strategic Development Group/New Jersey City University/Claremont Construction
Size: 346,212 GSF
Status: On-going
Phase: Schematic Design
- Produced renderings for new mixed-use residential, theater and Center for the Arts.
- Coordinated with Civil and Environmental Engineers.
- Coordinated with MDT faculty to design state-of-the-art theater for university needs.

Tower Health Executive Offices - West Reading, Pennsylvania
Program: Commercial Office Interiors
Client: Tower Health
Size: 17,000 GSF
Status: Under Construction
Phase: Construction Documents

Hightstown Mill Site Development: Brick Building - Hightstown, New Jersey
Program: Multi-family Residential/Adaptive Re-use
Client: R. Black Global
Size: 94,000 GSF
Status: Unbuilt
Phase: Construction Documents
- Produced drawings for adaptive re-use of existing warehouse for new multi-family residential.
- Produced exterior details for 100% Construction Documents.
- Coordinated with Structural and MEP Engineers

Mar 2017 - current
 

Imrey Studio, New York, NY, US, Freelance Architectural Design Consultant

Christie’s Work Spaces and Art Warehouses - New York, New York
Program: Commercial
Client: Christie's
Size: 45,000 SF
Status: Under Construction [2016-2017]
Phase: Construction Documents
- Produced drawing sets for warehouse spaces and conducted field surveys of the spaces.
- Developed the design for warehouse racking systems and produced drawings.

Kingsbridge Heights Community Center - Bronx, New York
Program: Institutional, Non-profit
Client: KHCC
Size: 28,000 SF [8,000 SF new building]
Status: On-going
Phase: Design Development
- Produced the Design Development drawings for Phase 1 and 2 of a new community center

UOVO Art Storage Warehouses - Blauvelt, New York
Program: Commercial
Client: UOVO
Size: 140,000 SF
Status: Under Construction [2016]
Phase: Construction Documents
- Developed the design for Phase 1 of the warehouse containing art storage and private offices.
- Produced the Design Development and Construction Documents for demo and renovation.
- Produced drawings for optimized warehouse racking and racking systems.

Sep 2015 - Mar 2017
 

RAFT Architects, New York, NY, US, Senior Architectural Designer

Primary School 376Q - Bayside, Queens, New York
Program: Institutional [Primary School, Grades Pre-K through 5]
Client: NYC School Construction Authority [SCA]
Size: 75,000 GSF
Status: Built
Phase: Contract Documents
- Aided in the production of drawing sets for new primary school.
- Produced exterior details for 100% Design Development.
- Produced exterior details for 100% Construction Documents.
- Compiled design presentation packages for bi-weekly client progress meetings.

186 Remsen - Brooklyn, New York
Program: Commercial, Hospitality, Restoration
Client: UpVentures & Plan Do See
Size: 73,250 GSF
Status: Unbuilt
Phase: Concept to Landmarks Preservation Commission
- Developed multiple iterations of design and massing strategies.
- Produced concept packages for weekly client/consultant meetings.
- Assisted in the production of the presentation for the Landmarks Preservation Commission.

Sky Tower - Jeddah, Saudi Arabia
Program: Mixed-Use [Retail, Residential]
Client: Private
Size: 38,850 GSF
Status: Unbuilt
Phase: Concept Design
- Assisted in the design and production of multiple schemes for client’s approval.
- Developed the design for tower and exterior envelope.

P. Mohammad Bin Saud Villa - Jeddah, Saudi Arabia
Program: Residential
Client: Bin Saud Family
Size: 22,000 SF
Status: Unbuilt
Phase: Concept Design
- Developed the concept design for a residential palace.
- Produced concept packages for client presentation.

Aug 2014 - Sep 2015
 

GLUCK+ (formerly Peter Gluck and Partners Architects), Harlem, NY, US, Designer

Collegiate School - New York, New York
Program: Institutional [Grades K through 12]
Client: Collegiate School
Size: 175,000 SF
Status: Unbuilt
Phase: Design Development
- Produced exterior details and drawing sets for all boys’ school in NYC.
- Coordinated structural elements with overall building and exterior design.

Olivebridge Barn - Olivebridge, New York
Program: Residential
Client: Private
Size: 18,000 SF
Status: Under Construction
Phase: Construction Documentation [ALDB]
- Assisted in the design, production of renderings and drawings of a barn in upstate New York which burned down. This ALDB (Architect Led Design Build) project aimed to reprogram and redesign the barn into a suitable vacation home.

Jul 2013 - Apr 2014
 

Gensler, New York, NY, US, Job Captain/Designer

MHOD Park Hyatt - Doha, Qatar
Program: Hospitality
Client: Msheireb Properties
Size: Confidential
Status: Built
Phase: Construction Documentation
- Coordinated structural and mechanical systems with architectural design and intent.
- Produced technical drawings and packages for coordination with consultants.

Nov 2012 - Jul 2013
 

Kohn Pedersen Fox Associates (KPF), New York, NY, US, Job Captain

CTF Finance Centre - Guangzhou, China
Program: Supertall, Mixed-use [Hospitality, Retail, Office]
Client: New World Development Company Limited, K11, Rosewood Hotels
Size: Tower - 287,600 sm / Podium - 242,400 sm
Height: 530m [5th tallest building in the world]
Status: Built
Phase: Construction Documentation
- Worked on the 100% SD and DD drawing set for the podium curtainwall.
- Worked on the 100% Design Development drawing set for the office interiors scope.
- Produced details and Tender documents for construction and bidding.
- Coordinated design/technical meetings between consultants and client.
- Compiled drawing set for visual mock-up of the podium curtainwall design.
- Experience with red-lining construction documents and construction administration.
- Traveled to Hong Kong to lead coordination meetings with client and consultants.
- Traveled to Guangzhou, China to inspect podium curtainwall visual mock-up.
- Traveled to Guangzhou, China to review the site progress and construction.

Chengdu Riverside - Chengdu, China
Program: Master Plan, Hospitality, Residential
Client: New World Development Company Limited, K11, Rosewood Hotels
Size: 51,000 sm
Status: Unbuilt
Phase: Schematic Design
- Converted the hotel of the overall master plan from AutoCad over to Revit
- Produced a BIM model in preparation for 100%DD based off of the 100%SD set

Nov 2011 - Nov 2012
 

Kohn Pedersen Fox Associates (KPF), New York, NY, US, Architect/Designer I

CTF Finance Centre - Guangzhou, China
Program: Supertall, Mixed-use [Hospitality, Retail, Office]
Client: New World Development Company Limited, K11, Rosewood Hotels
Size: Tower - 287,600 sm / Podium - 242,400 sm
Height: 530m [5th tallest building in the world]
Status: Built
Phase: Schematic Design
- Helped develop the concept and design for the supertall tower and the retail podium
- Compiled design presentation packages for weekly client/consultant meetings
- Produced a full Fang An set for approval
- Produced a full 100%SD drawing set

Aug 2009 - Nov 2012
 

Education 

Syracuse University, Syracuse, NY, US, BArch, School of Architecture

Aug 2004 - May 2009
 

Syracuse University in Florence, Florence, IT, BArch, SU Abroad

Aug 2007 - Dec 2007
 

Areas of Specialization 

Skills