Investigation & renovation of (my) hallway bath in Northern NJ.
Read more
Status: Built Location: Northern NJ My Role: Design-Builder
Investigation revealed wet& rotting plywood behind the tiled bath surround (and indicates an ongoing leak).
Removal of the "wobbly" floor revealed many years' worth of shims & incompatible materials (probably installed in an attempt to "level" the floor for tiling). All these materials were removed & replaced with a self-leveling lightweight slab.
Installation of electric radiant heat wiring to replace forced air vent (
Plywood was replaced with backerboard; new subway tile installed around the existing cast iron tub. Tub enamel was cleaned & repaired.
Adhered ceiling tiles to conceal the remaining adhesive & grout on the ceiling.