- Developed design and performed drawings for Schematic Design (SD), Design
Development (DD) and Construction Documents (CD) phases
- Integrated drawings from consultants, clients, contractors, and design director
- Built Building Information Modeling (BIM) models and 3D models
- Reviewed building codes
Status: Under Construction
Location: Chiayi, TW
My Role: Project Designer
Additional Credits: Architect: Chien Architects & Associates