Archinect
kadawittfeldarchitektur

kadawittfeldarchitektur

Aachen, DE

anchor
image © Helmut Pierer | kadawittfeldarchitektur
image © Helmut Pierer | kadawittfeldarchitektur
12 more images  ↓

CENTRAL STATION, SALZBURG | AUSTRIA

BRIEF Conversion of the existing main railway station into a through station including improved track access and roof coverings for the new platforms | ADDED VALUE By enlarging the platform underpass and creating a naturally lit shopping arcade, the access route to the tracks is transformed from being a dark passage to a busy pedestrian zone. The reorganisation of Salzburg Hauptbahnhof with a new entrance on the east side of the station is an urban densification project, which has helped to not only create public space but also connect the city districts either side of the tracks.

The authentic integration of the existing historic structures into the new scheme of Salzburg’s main railway station gives the complex a distinct and fascinating character. The curved roofs stretching along the platforms adjoin the carefully restored, intricately designed historic station hall and form a large surface above the platforms. The dynamic structure interprets the movements of arriving and departing trains, and thus gives the station a unique appearance. Accessed via the restored historic railway hall, the shopping arcade, which is designed as a landscaped urban space with large open areas, not only connects the various levels and functions of the station project but also activates urban life by functioning as a link between the two city districts either side of the tracks.
A large curved roof marks the new station entrance in the city district Schallmoos. Matching the movement of travellers, the parabolically curved roof surface drops naturally towards the entrance of the shopping arcade and guides shoppers in and out of the station.

Typology infrastructure   Construction volume alteration of existing building 2.764m², extension under platform 13.000m², construction volume 57.500m³, platform area 19.000m², platform roofed area 23.400m², roof area Schallmoos 2.200m²  Client ÖBB Infrastruktur AG  Realisation 2009 – 2013/2014 start project planning 01/2006  Competition 1st prize 1999   Project manager Aldrik Lichtwark 

 
Read more

Status: Built
Location: Salzburg, AT

 
image © Robert Deopito | kadawittfeldarchitektur
image © Robert Deopito | kadawittfeldarchitektur
image © Robert Deopito | kadawittfeldarchitektur
image © Robert Deopito | kadawittfeldarchitektur
image © Helmut Pierer | kadawittfeldarchitektur
image © Helmut Pierer | kadawittfeldarchitektur
image © Helmut Pierer | kadawittfeldarchitektur
image © Helmut Pierer | kadawittfeldarchitektur
image © Robert Deopito | kadawittfeldarchitektur
image © Robert Deopito | kadawittfeldarchitektur
image © Helmut Pierer | kadawittfeldarchitektur
image © Helmut Pierer | kadawittfeldarchitektur
image © Helmut Pierer | kadawittfeldarchitektur
image © Helmut Pierer | kadawittfeldarchitektur
image © Helmut Pierer | kadawittfeldarchitektur
image © Helmut Pierer | kadawittfeldarchitektur
image © Angelo Kaunat | kadawittfeldarchitektur
image © Angelo Kaunat | kadawittfeldarchitektur
section © kadawittfeldarchitektur
section © kadawittfeldarchitektur
section © kadawittfeldarchitektur
section © kadawittfeldarchitektur
picto © kadawittfeldarchitektur
picto © kadawittfeldarchitektur