Coca-Cola Head Office Refurbishment
1. RECEPTION
- Demolition and carting away of existing seating areas and reception table
- Provision of waiting area furniture and reception desk
- Demolition, carting away and replacement of existing floor finish and provision of necessary lighting
- Relocation of drinks chiller into wall recess
- Refurbishment of visitor’s toilet
- Creation of a store room from existing mail room, with entrance door located within the right wing of the ground floor open plan office area
- Making good of wall finish in reception area
2. OPEN OFFICE AREA
- Removal, carting away and replacement of existing floor finish
- Provision of 600x600mm suspended acoustic ceilings
- Provision of 600x600mmmodular light fittings
- Make good existing windows
- Provision of break out areas/chill out zones and tech bays
- Provision of proposed number work stations, break out seating and storage
3. ENCLOSED OFFICES
- Removal, carting away and replacement of existing floor finish
- Provision of 600x600mm suspended acoustic ceilings
- Provision of 600x600mm modular light fittings
- Making good of existing windows
- Provide necessary work statons, meeting table, visitor seating and storage
4. KICHENETTES AND TOILETS
- Removal, carting away and replacement of existing wall and floor finishes
- Change of toilet stall doors
5. GENERAL NOTES
- Painting of walls on ground and first floors
- Making good existing doors and ironmongery into toilets, kitchenettes and service ducts.
Status: Built
Location: Lagos, NG