Archinect
LEDDY MAYTUM STACY Architects

LEDDY MAYTUM STACY Architects

San Francisco, CA

anchor

University High School California Street Campus

For over 40 years, San Francisco University High School (SFUHS) has excelled as a leader in secondary education in the Bay Area, building strong and deepening ties among its students, teachers, administrators, families, alumni, and the larger community. This will be the school’s first ground-up project, which will support reorganizing and re-energizing their existing four building campus. The new facility will replace a 1940s-era strip mall, an L-shaped building with onsite parking which had occupied the location. As an urban infill project, the building will add density to an underused site, provide a public face for the campus on a transit-rich, mixed-use street, and enrich the public life of the block. 

The proposed 48,000-square-foot building will help to address challenges of the existing campus, which has outgrown its existing campus that is spread over several blocks in the Pacific Heights Neighborhood. Currently, STEM facilities are split between multiple buildings on campus. The California Street Campus will unite all the STEM classrooms and faculty offices on a single floor. The existing gymnasium, "The Devil Dome,” no longer serves the needs of a thriving athletic program. The new gymnasium will allow for multiple practice courts and a 650-seat competition court, which will also double as a venue for all-school meetings. With the addition of the California Street Campus, access to food, administration, faculty, and community can be spread evenly across the five campuses unifying the character of the school and creating fertile ground for learning. The California Street Campus is targeting Net -Zero Energy, becoming a teaching tool for a sustainable future. Under construction, the project’s estimated completion date is Spring 2025.  

LMSA Design Team 
William Leddy 
Aaron Thornton 
Frances Kwong 
Jasen Bohlander 
Aruna Bolisetty  
Chris Detjen 
Sara Sepandar 

Project Team 
Architecture and Interiors: Leddy Maytum Stacy Architects 
Contractor: Truebeck Construction 
Structural Engineer: Forell Elsesser 
MEP/Lighting Engineer: PAE/LUMA 
Civil Engineer: Luk and Associates 
Landscape Architect: In Situ landscape Architecture 
Food Service: Patrick Stein and Associates 
Dry Utilities: Urban Design Consulting Engineers 

Renderings 
Leddy Maytum Stacy Architects 

 
Read more

Status: Built
Location: San Francisco, CA, US
Firm Role: Architecture, Interiors
Additional Credits: Contractor: Truebeck Construction
Structural Engineer: Forell Elsesser
MEP/Lighting Engineer: PAE/LUMA
Civil Engineer: Luk and Associates
Landscape Architect: In Situ landscape Architecture
Food Service: Patrick Stein and Associates
Dry Utilities: Urban Design Consulting Engineers

 
University High School (Leddy Maytum Stacy Architects)
University High School (Leddy Maytum Stacy Architects)
University High School (Leddy Maytum Stacy Architects)
University High School (Leddy Maytum Stacy Architects)
University High School (Leddy Maytum Stacy Architects)
University High School (Leddy Maytum Stacy Architects)
University High School (Leddy Maytum Stacy Architects)
University High School (Leddy Maytum Stacy Architects)