ACV-CSC-METEA Campus by evr-architecten & Bureau Bouwtechniek

The old ACV-CSC-METEA campus at Sint Pietersstation in Ghent stretched between Koning Boudewijnstraat and Koning Albertlaan consisted of a sequence of several buildings (with two facades and two views) on the street, and three smaller buildings in the courtyard. The existing buildings hardly interacted with their surroundings. The whole did not show its semi-public programme to the neighbourhood in any way. In addition, the campus' existing buildings formed an unorganised whole, both structurally and architecturally. Over the years, various interventions and renovations distorted and warped this cluster of buildings, resulting in a lack of functional coherence, interaction, and legibility.

Maximum efforts were initially made to preserve the existing infrastructure: the old archives cellar was transformed into a bicycle shed and made accessible from the street, the three existing rear volumes were stripped and renovated in their entirety according to BEN principles. Despite their robust structure, the existing main volumes were not compatible with contemporary comfort requirements. They were demolished and replaced by a new volume in a wood construction. By building with wood, the carbon footprint of the new building is significantly reduced, a very conscious choice by the client and the design team.

By opening the rear volumes and connecting them in a clear way to the new volume, the desired building programme could be fully realised. The building on the Koning Albertlaan could be disconnected and two open, green gardens were created in the courtyard that connected seamlessly with the cafeteria and meeting rooms. In addition to the reuse and renovation of the existing volumes, a complete inventory of the existing movable and fixed infrastructure was already made in the demolition phase, together with Labeur vzw, as well as of the joinery and specific (dismountable) building materials. Items such as insulation, interior joinery and finishings could thus be given a second life via an alternative circuit. A number of specific elements (including the existing cupboard doors, kitchen appliances, reels and acoustic sliding walls) could be reused in the new building.

At the ground floor, the new main volume consists of a glass, inward-sloping volume and a wide subpassage, creating a strong link between the inner area and the street. In this way, access to the building, the inner area and underground bicycle shed are opened. The glass plinth forms a transparent structure. The entire ground floor is covered by the cafeteria with informal work and meeting areas at the street façade, and service functions and meeting rooms in the rear building. The floors above include lecture rooms, offices, and meeting rooms for ACV-CSC-Metea. The main building stands on a new concrete basement - where all the technology and necessary storage rooms have been housed - and is hemmed in on its southern flank by a concrete staircase and lift core. The three upper floors, with mainly offices and meeting rooms, are built entirely of solid wood. By combining slender solid wood floor slabs and beams, the techniques (lighting and climate ceiling) can be incorporated into the grid of the ceiling. The result is a balanced and warm interior with lots of visible structured wood, combined with bright infills for the climate ceiling, raised floors and walls. The open structure allows the various office platforms to be completely dismantled and freely reconfigured from the inside in the future.

In collaboration with Bureau Bouwtechniek, based on a dynamic daylight and shading study, a sophisticated balance between daylight access, shading, direct exterior visibility and maintenance parameters was developed to achieve the right dimensions of the fins and grid dimensions of the façade. The vertical deep wooden slats keep out direct sunlight, while the soft-white lacquered horizontal fins reflect diffused daylight well into the offices.  

Also, by inclining the vertical louvres in different directions, the strongest peaks in daylight exposure can be levelled out throughout the day. The wooden slats, composed of thermally treated boards in fsc pine, not only provide passive sun protection for the various office floors, but also give the building a rhythm and appearance. The horizontal articulation seeks to complement the rhythm of the adjacent houses and is akin to the typical cornices of these buildings.

 
Read more

Status: Built
Location: Ghent, BE
Firm Role: architect
Additional Credits: Participating parties:
Stability: Dexco, Adviesbureau Brekelmans, Buro Kiss
Techniques: Istema
Acoustics: D2S
Façade consultancy: Bureau Bouwtechniek
Re-use materials: Labeur VZW
Landscape design: Denis Dujardin

 
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
©Stijn Bollaert
implantation plan
implantation plan
level -1
level -1
level +1
level +1
level +2
level +2
level +3
level +3
level 0
level 0
roof
roof
section AA
section AA
section BB
section BB
West facade
West facade