SIZE 20,000 SF
TYPE TEMPORARY CULTIVATION AUTHORIZATION
SCHEDULE 30 DAYS
SCOPE
· Speedy configuration of temporary cultivation facilities, office trailers, site fencing and security cameras, etc. to pass Florida Department of Health cultivation inspection in a swift 30 days
· Designed and built-out of Phase I in accordance with the MA plans (greenhouse and accompanying production space) and Phase II to add indoor cultivation and additional production and support space as needed
· Prepared feasibility traffic and environmental phase 1 engineering studies, completed soil borings and geotechnical report
· Completed feasibility study for access to water, power and sewer
· Prepared final architectural, structural, HVAC, plumbing and electrical designs and construction drawings
· Coordinated box and power requirements with clients’ IT, security and data providers
· Provided technical specifications, signed and sealed drawings, and obtain permit
Status: Built
Location: Umatilla, FL, US
Firm Role: Design-Builder
Additional Credits: A/E CONSULTANT - PATHANGAY ARCHITECTS, LLC