STIK project part 6

the final target form measured 12.5m X 5.0m x 3.8m one of four axonometric drawings showing panel locations markers placed on site by surveyor precut plywood panels placed timber foundation and entry installed concrete anchors installed first layer of sticks poured in-situ with machine first prefabricated panels installed placement of the rest of row. Shoring to allow time for glue to cure panel joints infilled onsite to create seamless surface second row of prefabricated panels installed placement of the rest of row. Shoring to allow time for glue to cure final row of prefabricated panels installed placement of the rest of row. Shoring to allow time for glue to cure one of the 40 panel drawings made to supplement our scanning system portico structural model simple cable crimping details foundation of portico detail

concrete anchors installed

concrete anchors installed