Portland, OR + Los Angeles, CA
Developer driven study on the utilization of metal volumetric modular units for a market rate tower in downtown Toronto. Utilization of prefabricated facade elements are to be utilized to accelerate completion of construction by almost 40%
Status: Unbuilt
Location: Toronto, ON, CA
Firm Role: Architectural Firm in Charge