London, GB
Arup designed 2-3 Finsbury Avenue to replace two existing offices in the Broadgate Campus, near Liverpool Street Station. The development consists of four tapered buildings including a 32-storey tower, and responds to the increasing demand for office space in the City of London. Arup lead the successful planning submission which realised an increase in commercial space from the existing building of 190,471 sqft to 561,254 sqft. and we are currently providing full multidisciplinary services to the project including architecture, structural and mechanical engineering, public health, and all specialist design services.
The architectural design is configured to permit a new and more dynamic pattern of City working and living by providing its occupants with a range of amenities close to hand. At ground level the street frontages will provide a significantly enhanced retail offer and a new diagonal route has been proposed providing improved connectivity to the north through the Campus. A 13th floor restaurant, café and roof terrace will be accessed by glass lifts.
Status: Built
Location: London, GB