Coppola and Sons Construction, Stamford, CT, US, Designer and Cost Estimator
• Surveying as-builts for proposed additions on projects
• Estimating and taking square foot quantities of masonry/brick veneer
• Shop drawings for limestone and window details using AutoCad and Sketchup.
• Verifying all dimensions in field prior fabrication and installation of materials
• Residential Locations include: 10 Hurlingham Dr. Greenwich, CT. / 30 John St. Greenwich, CT/ Hahn Residence 24 Partridge Lane Weston, CT.
• Store located on 680 East Main Street Stamford, CT.
MAF Architects, Stamford, CT, US, Drafter for Michael A. Fromm AIA
• Surveying and drafting plans and elevations for expansion on projects.
• 3d modeling using AutoCad, and Google Sketchup for presentations
• Proposals of roof types, trellis, patios and deck using perspectives
• Projects: Mcloskey Residence, Fromm Residence, and Callari Residence.
• Drafted/Coordinated mark-up plans with Habitat for Humanity Coastal Fairfield County located on 1542 Barnum Ave, Bridgeport, CT 06610
• Surveying the Interior walls and as-builts for the Viridian Project: Regional Energy Holdings Inc. 1055 Washington Blvd. Suite 700 Stamford CT. 06901
• Drafting demolition, construction, power, and reflected ceiling plans with the use of AutoCAD
• Drafting elevations and sections for the Contractor.
• Attended the Client review with Michael Fromm to discuss modifications on the Viridian project
• Attended a meeting with Signature Construction on work progress
City of Stamford, Stamford, CT, US, Intern for the Engineering Department
• Assisting Project Engineers in administrative functions
• Organizing a database regarding certificates, building permits and block waivers for locations throughout Stamford
• Spreadsheets on bid summaries
• Proposed drainage basin plan for Cove Island Park playground renovation
• Survey at Barrett Park, Stamford: Used a Reading Rod to calculate benchmark elevations, and high elevations. Examples include grade, top of wall, curbs, steps
• Scofieldtown Landfill Closure survey for site progress.
• Tour with internship group to NBC Universal Sports complex in Stamford, CT
Norwalk Community College Cooperative Education Internship, Stamford, CT, US, Drafter for John L. Downs Architect Planner LLC.
• Drafting Floor Plans and Elevations
• Modifying Plans and Notes
• Calculations on Floor Area Ratio, Site Plan, Grade Plan, and Building Coverage with the use of Microsoft Excel
University of Connecticut, Stamford, CT, US, Assistant for the Center of Woman's Studies
• Creating Promotional Fliers
• Maintained Library Database
• Outreach to Students and Stamford Community
UBS, Stamford, CT, US, IT Department Intern- Experience within the EIGHT Team (Integrated Management Services)
• Web design and basic form building (HTML), data evaluation, change management
• Updating the IMS Website daily
• Planning structures for Web templates
• Compiling information for progress reports to the IMS staff
• Using Global Change Management System (GCMS) to research additional data