The task was to design a multi purpose hall for Mr Jonas Mumba, the hall was to house a capacity of 200 seats.
Status: Under Construction
Location: Luanshya, ZM
My Role: Drafter and Designer
Additional Credits: Gold Chance construction was awarded the contract to build the structure.