Hinerfeld-Ward, Inc. General Contractor, Los Angeles, CA, US, Construction Project Manager
Provided project management services on numerous residential and commercial projects as follows:
• Oversaw all Architect, owner and subcontractor coordination
• Coordinated with jobsite superintendent on a daily basis
• Created and maintained project budget and schedule
• Compared all subcontractor bids against project budget, negotiate and issue change orders
• Reviewed all drawings, addendum, instruction bulletins and issue to subcontractors
• Reviewed, negotiated and issued all subcontractor change orders
• Reviewed, issued and tracked all RFI’s and submittals
• Reviewed subcontractor invoices, confirmed percentage of completion with job-site, created and issued applications for payment including all owner required backup
• Lead weekly job-site meetings with clients, architects, subcontractors and job-site superintendent.
• Monitored punch list to ensure completion for client move-in
• Prepared and issued project closeout packages including all subcontractor warranties and contact information, property maintenance recommendations, and property equipment & appliance owner manuals
Project List:
• Ray Kappe, Los Angeles: residential renovation and addition of an original Ray Kappe residence built in the 1950's 2,000 SF ($850,000)
• Neil Lane Jewelry, Los Angeles: tenant improvement 1,500 SF ($800,000)
• New hillside residential construction, Los Angeles: 3,000 SF ($1.9)
• Monique Lhuillier Boutique, Los Angeles: tenant improvement 3,500 SF ($2.5)
HED, Los Angeles, CA, US, Designer / PA
Volunteered for and contributed Instagram posts at the office lunchtime Design Café on a weekly basis
Service Titan:
• PA for a multi-level commercial tenant improvement
• Exiting and code analysis
• Coordinated and collaborated with consultants
• Coordinated and collaborated with design team
• Assembled Plan Check set, reviewed with City of Glendale Plan Checkers
Greenland:
• Designed a 3,600 SF tenant improvement
• Space Planning, overall design concept and finish selection
• Exiting and code analysis
• Responsible for consultant coordination
• Assembled Plan Check Set
USC University Village:
• Assisted project designer on documentation for all unit plans pertaining to code analysis and finish coordination throughout the plan check set
J.M. Costello Consulting, Los Angeles, Design Consultant
John Friedman Alice Kimm Architects:
• Responsible for schematic design for a technology company’s office T.I. space
• Collaborated with teammates and consultants on a new ground up 48,000 SF facility at a water treatment plant
Hughes Umbanhowar Architects:
• Responsible for design development presentation drawings for a single-family residential remodel and new Accessory Dwelling Unit, includes video of interior walkthrough for client review
Perkins&Will, Los Angeles, CA, US, Interior Project Designer
Providence Tarzana Medical Center:
• Developed patient room design / experience for a new 200 bed patient wing
• Maintained design intent throughout design development and construction documents including but not limited to specifications
• Redeveloped medical planning for design clarity
HED, Los Angeles, CA, US, Designer / Job Captain
Pepperdine School of Law:
• Job Captain for renovation of an existing building for the auditorium, atrium and restrooms
• Coordinated and collaborated with consultants and design team
• Responsible for all documentation with project architect
Metropolis Phase 1, multi-family residential high rise:
• Brought all design development drawings up to CD phase
• Collaborated with the design architect throughout CD phase in order to maintain design intent
J.M. Costello Consulting, Los Angeles, CA, US, Design Consultant
Shigetomi Pratt Architects
Kevin Oreck Architects
Assist sole practitioners with numerous residential projects at varying stages:
• Prepared drawings for Plan Check for several single-family residential renovations
• Addressed Plan Check Corrections and coordinate consultant Plan Check Corrections
• Obtained Building Department signoff’s and submit permit applications
• Executed schematic design drawings for a 7,000 SF single-family residence
• Incorporated interior designer backgrounds into design development drawings for a 5,000 SF high rise residential condominium
• Coordinated consultant drawings on numerous projects
Hilgendorf Corporation, Architect / General Contractor:
Oversee and collaborate with project team for a tenant improvement of a corporate office and distribution center:
• Responsible for Space planning an 8,300 SF Technical Design studio and 11,000 SF corporate office for a local fashion designer
• Oversaw and contributed to the preparation of Design development for a 13,000 SF corporate office for a local fashion designer
• Attendeded all client design meetings and consultant coordination meetings
• Construction administration for above referenced projects
Assisted with construction project management for a 30M Richard Meier & Partners Beverly Hills single-family residence
Johnson Fain, Architecture Planning Interiors, Los Angeles, CA, US, Intermediate Interior Designer
Volunteered for and contributed research for new products and introduced them to all in-house architects and designers on a monthly basis
• Performed numerous space planning studies including efficiency calculations for developer review for high rise condominiums and office buildings
• Developed a program for a 60,000 SF television studio including offices and post production facilities at NBC/Universal Studios. Includes touring and documentation of existing facilities, on-site meetings with department executives to discuss future needs assessments, prepare department adjacency diagrams, and assemble and issue final program documentation
• Design documentation for a commercial loft conversion including main lobby, typical elevator lobbies and pool deck
SPF:a, Los Angeles, CA, US, Job Captain
The Getty Villa, Malibu, Getty Villa West Campus/New Construction:
Prepare construction documents for a 250 seat auditorium and outdoor amphitheater including the following tasks:
• Audio visual and theatrical lighting engineer coordination
• Mechanical, electrical, plumbing and structural engineer coordination
• Design architect coordination
• 3-D modeling
• Architectural details
Lee, Burkhart, Liu, Inc. Architecture Planning Interiors, Santa Monica, CA, US, Associate: Junior Designer
• Space planned a 195,000 SF Acute Care addition at USC University Hospital including Admitting, Dining, 18 bed ICU, 11 O.R.’s with Surgery Support, Central Processing and 26 bed Nursing Unit
• Prepared phasing plans of existing USC University Hospital required for Acute Care addition
• Prepared Structural Modifications Construction Document Package for existing USC University Hospital required for new Acute Care addition including remodel of existing Pre-Op and Recovery Areas
• Responsible for space planning, design development, MEP coordination, and construction documentation for a 190,000 SF Kaiser Permanente medical office building
• Space planned a 200,000 SF administration building with conference center for Kino Public Health Center
• Assisted senior design architect with numerous preliminary design layouts, presentation drawings and models
California State Polytechnic University, Pomona, Pomona, CA, US, MArch, Master of Architecture
University of Massachusetts Amherst, Amherst, MA, US, Bachelor of Fine Arts, Interior Design