Faced with an expanding student population and deteriorating conditions in a century-old building, the City of Chelsea elected to replace the existing Clark Avenue School with a new facility better suited to provide a 21st-century education and support community activities. Situated on a 1.4-acre urban site, the new Clark Avenue School was carefully planned and constructed in two phases while the existing school remained in operation, just nine feet from the new construction.
As the drama-focused feeder school to Chelsea High School, the new building’s specialized areas and organization support and showcase student performances with venues for large productions and smaller, more intimate performances. The auditorium, gymnasium, and other specialty and classroom spaces also serve the community after school hours, hosting a range of activities.
While the former school lacked outdoor space forcing students to congregate on small sidewalks, the new building has a more compact footprint. The design introduces student gardens as well as an entry plaza with tiered seating for student performances, community movie nights, and a space for students to gather and socialize before and after school.
Status: Built
Location: Chelsea, MA
Firm Role: Architect