Please see the Hills Road project on our website for full project details.
Stepped access to the building frontage was required to address the difference in level between the building entrance and pavement level. We worked closely with the project architects to ensure a desirable outcome was achieved. As it was not possible to accommodate a DDA compliant ramp within the limited space to the building frontage it was necessary to incorporate a platform lift within our landscape proposals.
Status: Built
Location: Cambridge, GB
My Role: Landscape Architect