Archinect
Kimmo Sahakangas

Kimmo Sahakangas

Torrance, CA, US

anchor

SATCO Warehouse / 2013-2016

A manufacturer of air cargo equipment required a new warehouse facility for their extensive line of products. It is covered with a large mono-pitched roof. Stacked cinder block with a burnished finish is a counterpoint to the building's prefabricated metal panel wall system and features a syncopating rhythm. A break room mezzanine overlooks the facility. Located in the Smoky Hollow District, specific design parameters were met.

 
Read more

Status: Built
Location: El Segundo, CA, US
My Role: Senior Project Architect / Lead Designer
Additional Credits: Knight Building Systems - General Contractor
BGB Inc. Landscape Architects / Arthur Guy III