Archinect - News 2024-12-26T21:29:02-05:00 https://archinect.com/news/article/150304555/updated-designs-of-the-hs2-london-euston-high-speed-railway-station-released Updated designs of the HS2 London Euston high-speed railway station released Nathaniel Bahadursingh 2022-03-28T15:28:00-04:00 >2024-10-25T04:07:38-04:00 <img src="https://archinect.gumlet.io/uploads/61/616ea54bf9784837e12f9c4ff132105b.jpg?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><p><a href="https://archinect.com/news/tag/647109/hs2" target="_blank">HS2</a> Ltd., the British non-departmental public body behind the development of High Speed 2 (HS2) national <a href="https://archinect.com/news/tag/576028/high-speed-rail" target="_blank">high-speed railway</a>, has released an updated design for its new terminus station at <a href="https://archinect.com/news/tag/722/london" target="_blank">London</a> Euston.&nbsp;</p> <p>Two new images, <a href="https://archinect.com/news/article/136423345/grimshaw-and-arup-release-designs-for-new-high-speed-rail-hub-in-central-london" target="_blank">updated from 2015</a>, show the concept design for the interior and exterior of the station. They were drafted by a design consortium made up of <a href="https://archinect.com/aruparchitects" target="_blank">Arup</a>, <a href="https://archinect.com/news/tag/1017903/wsp" target="_blank">WSP,</a> <a href="https://archinect.com/grimshaw" target="_blank">Grimshaw Architects</a>, <a href="https://archinect.com/haptic-architects" target="_blank">Haptic</a>, and <a href="https://archinect.com/LDAdesign" target="_blank">LDA Design</a>, alongside HS2&rsquo;s Station Construction Partner, Mace Dragados JV (MDJV).&nbsp;</p> <figure><p><a href="https://archinect.gumlet.io/uploads/59/59aee40babe4e20dac5aea848142a524.jpeg?auto=compress%2Cformat&amp;enlarge=true&amp;w=1028" target="_blank"><img src="https://archinect.gumlet.io/uploads/59/59aee40babe4e20dac5aea848142a524.jpeg?auto=compress%2Cformat&amp;enlarge=true&amp;w=514"></a></p><figcaption>Previously on Archinect: <a href="https://archinect.com/news/article/136423345/grimshaw-and-arup-release-designs-for-new-high-speed-rail-hub-in-central-london" target="_blank">Grimshaw and Arup release designs for new high-speed rail hub in central London</a></figcaption><p><br></p><p>One of the station&rsquo;s defining features is a bold, geometric roof that will allow natural light to infiltrate the interior while also emphasizing its north-south alignment. According to HS2, elements of the roof can be prefabricated off-site and installed using <a href="https://archinect.com/news/tag/71523/modular" target="_blank">modular</a> construction techniques. The station, itself, will span three levels, with ten 450-meter-long subsurface platforms. At peak operation, ...</p></figure> https://archinect.com/news/article/136423345/grimshaw-and-arup-release-designs-for-new-high-speed-rail-hub-in-central-london Grimshaw and Arup release designs for new high-speed rail hub in central London Amelia Taylor-Hochberg 2015-09-12T05:15:00-04:00 >2016-06-21T20:57:14-04:00 <img src="https://archinect.gumlet.io/uploads/cs/csw0d22xreixk215.jpg?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><p>Beginning in 2017, the London transit hub that's been described as "a dingy, grey, horizontal nothingness"<a href="https://en.wikipedia.org/wiki/Euston_railway_station#cite_note-19" rel="nofollow" target="_blank">*</a>&nbsp;will undergo a massive redesign to incorporate a new&nbsp;high-speed rail line connecting London and Birmingham.</p><p>The first phase of the so-called HS2, connecting London and Birmingham (before&nbsp;forking out to reach Manchester and Leeds in phase two), is expected to open in 2026, and developer HS2 Ltd. has just released designs by <a href="http://archinect.com/firms/cover/4156025/arup" rel="nofollow" target="_blank">Arup</a> and <a href="http://archinect.com/firms/cover/22827902/grimshaw-architects" rel="nofollow" target="_blank">Grimshaw Architects</a> for its outset station in central London, a redevelopment of Euston station.</p><p><img title="" alt="" src="http://cdn.archinect.net/images/514x/vx/vxudn1x8g6qq2dvf.jpg"></p><p>Grimshaw and Arup's design crafts an incremental approach to maintain current activity at the station during construction. Additions to the station include 11 new platforms for the HS2, a new glass fa&ccedil;ade and three new entrances.</p><p><img title="" alt="" src="http://cdn.archinect.net/images/514x/cs/csw0d22xreixk215.jpg"></p><p>First opening in 1837, Euston station was London's first intercity line, and ranks as its 6th busiest. Its original classical design was demolished in 1961 and replaced with what has been derided by Richard Morrison of <em>The Times</em> as...</p>