Archinect - News 2024-12-22T00:17:25-05:00 https://archinect.com/news/article/150452091/watch-lax-s-new-midfield-satellite-concourse-south-taxi-to-its-final-destination Watch LAX's new Midfield Satellite Concourse South taxi to its final destination Josh Niland 2024-10-28T17:14:00-04:00 >2024-10-29T13:53:44-04:00 <img src="https://archinect.gumlet.io/uploads/4f/4f89eb27801277993ba0979786711bb7.jpg?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><p><a href="https://archinect.com/firms/cover/106435/woods-bagot" target="_blank">Woods Bagot</a> has shared a video from the recent overnight installation of its Midfield Satellite Concourse South (or MSC South) project at <a href="https://archinect.com/news/tag/315717/lax" target="_blank">Los Angeles International Airport</a> (LAX).</p> <p>The project adds around 146,000 square feet of space and eight gates designed to hold narrowbody aircraft.</p> <p>Video courtesy Woods Bagot</p> <p>Its realization was made possible by an innovative new process called Offsite Construction and Relocation (or OCR), which calls for an in-situ delivery staged in nine segments in order to avoid costly&nbsp;disruptions to air traffic operations after the process began earlier this year just north of the airport's northernmost runways.&nbsp;<a href="https://archinect.com/firms/cover/38008/burohappold" target="_blank">Buro Happold</a> (structural engineering, sustainability, lighting, and acoustical design) was able to ensure its delivery in partnership with <a href="https://archinect.com/firms/cover/106413/raw-international-inc" target="_blank">RAW International</a>.&nbsp;<br></p> <figure><p><a href="https://archinect.gumlet.io/uploads/20/206992eb9ae89bb8f36416fbbdc0a121.jpg?auto=compress%2Cformat&amp;enlarge=true&amp;w=1028" target="_blank"><img src="https://archinect.gumlet.io/uploads/20/206992eb9ae89bb8f36416fbbdc0a121.jpg?auto=compress%2Cformat&amp;enlarge=true&amp;w=514"></a></p><figcaption>Image: Los Angeles World Airports (LAWA)</figcaption></figure><p>The next step after this major hurdle will be to assemble each of the segments through 2025.&nbsp;<br></p> <figure><p><a href="https://archinect.gumlet.io/uploads/c7/c7dd05cfca967f2d15cc500bd9553dc9.jpg?auto=compress%2Cformat&amp;enlarge=true&amp;w=1028" target="_blank"><img src="https://archinect.gumlet.io/uploads/c7/c7dd05cfca967f2d15cc500bd9553dc9.jpg?auto=compress%2Cformat&amp;enlarge=true&amp;w=514"></a></p><figcaption>Image: Los Angeles World Airports (LAWA)</figcaption></figure><p>Woods Bagot&rsquo;s Ian L...</p> https://archinect.com/news/article/150424887/lax-midfield-satellite-concourse-south-project-has-topped-out-in-los-angeles LAX Midfield Satellite Concourse South project has topped out in Los Angeles Josh Niland 2024-04-22T17:46:00-04:00 >2024-04-23T02:39:54-04:00 <img src="https://archinect.gumlet.io/uploads/bd/bd7d2631d06afa6b1c23997c48f47021.jpg?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><p><a href="https://archinect.com/news/tag/315717/lax" target="_blank">LAX</a>'s new Midfield Satellite Concourse South (or MSC South) recently topped out as the project's construction progresses in nine segments toward its 2025 completion date. The offsite construction will eventually yield eight new gates and a total of 150,000 square feet of space following a first-of-its-kind integrated design for manufacturing and assembly (DFMA).</p> <figure><p><a href="https://archinect.gumlet.io/uploads/30/30afb604dd740fc051856d4fdb827f3c.jpg?auto=compress%2Cformat&amp;enlarge=true&amp;w=1028" target="_blank"><img src="https://archinect.gumlet.io/uploads/30/30afb604dd740fc051856d4fdb827f3c.jpg?auto=compress%2Cformat&amp;enlarge=true&amp;w=514"></a></p><figcaption>Related on Archinect: <a href="https://archinect.com/news/article/150356568/woods-bagot-s-lax-midfield-satellite-concourse-south-expansion-has-broken-ground" target="_blank">Woods Bagot's LAX Midfield Satellite Concourse South expansion has broken ground</a></figcaption></figure><p><a href="https://archinect.com/firms/cover/38008/burohappold" target="_blank">Buro Happold</a>, structural engineer, sustainability consultant, lighting and acoustical designer on the project, in partnership with architects <a href="https://archinect.com/firms/cover/106435/woods-bagot" target="_blank">Woods Bagot</a> and <a href="https://archinect.com/firms/cover/106413/raw-international-inc" target="_blank">RAW International</a>, says: "Each segment was designed with an independent lateral system consisting of buckling restrained braced frames in the east-west direction and Simspon Yield Link moment frames in the north-south direction to allow for access to gates along the terminal length. Additional analysis was then undertaken to determine the lifting points of each segment ...</p> https://archinect.com/news/article/150356568/woods-bagot-s-lax-midfield-satellite-concourse-south-expansion-has-broken-ground Woods Bagot's LAX Midfield Satellite Concourse South expansion has broken ground Nathaniel Bahadursingh 2023-07-13T16:42:00-04:00 >2024-10-25T04:07:38-04:00 <img src="https://archinect.gumlet.io/uploads/77/77c9d1adb00381a25eb9ef733c95d3d7.jpeg?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><em><p>A groundbreaking ceremony held in late June marks the official start of work on the LAX Midfield Satellite Concourse South project, an expansion of the recently-opened West Gates at Tom Bradley International Terminal.</p></em><br /><br /><p>The <a href="https://archinect.com/firms/cover/106435/woods-bagot" target="_blank">Woods Bagot</a>-designed $400 million MSC South project will add 150,000 square feet, spread across eight gates and two stories, to <a href="https://archinect.com/news/tag/315717/lax" target="_blank">LAX</a>. It forms part of Los Angeles World Airport&rsquo;s (LAWA), the airport authority that owns and operates the airport, $14.5 billion capital investment improvement project, which includes terminal renovations, the construction of new ground transportation hubs, and an <a href="https://archinect.com/news/tag/1286242/lax-automated-people-mover" target="_blank">automated people mover</a> system.&nbsp;</p> <figure><p><a href="https://archinect.gumlet.io/uploads/da/dafd7f499bda330b7bb4b5dc7f97b12b.jpeg?auto=compress%2Cformat&amp;enlarge=true&amp;w=1028" target="_blank"><img src="https://archinect.gumlet.io/uploads/da/dafd7f499bda330b7bb4b5dc7f97b12b.jpeg?auto=compress%2Cformat&amp;enlarge=true&amp;w=514"></a></p><figcaption>Aerial view of site. Image courtesy of Woods Bagot.</figcaption></figure><p>MSC South&rsquo;s construction will utilize what the architects describe as a first-of-its-kind technique, where its building components will be built offsite and then delivered to the location for assembly.<br></p> <p>The new concourse will have an L-shaped layout with an exterior brise soleil that will reduce glare and solar radiation while maximizing outdoor views. The design also draws inspiration from <a href="https://archinect.com/news/tag/1322/los-angeles" target="_blank">LA</a>&rsquo;s modernist homes. The project is grounded in <a href="https://archinect.com/news/tag/4450/sustainability" target="_blank">sustainable</a> practices as it aims for <a href="https://archinect.com/news/tag/5824/leed" target="_blank">LEED</a> Silver certification. Completion...</p>