Archinect - News2024-11-21T12:09:38-05:00https://archinect.com/news/article/150426232/webuild-and-carlo-ratti-propose-replacement-for-baltimore-s-collapsed-key-bridge-following-tragedy
Webuild and Carlo Ratti propose replacement for Baltimore’s collapsed Key Bridge following tragedy Josh Niland2024-05-03T15:28:00-04:00>2024-05-06T13:56:18-04:00
<img src="https://archinect.gumlet.io/uploads/16/16e7d4e9b873dc8a2b5fa9e944c6c585.png?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><p>Today, the <a href="https://archinect.com/news/tag/2417861/webuild" target="_blank">Webuild</a> group advanced a proposal designed in collaboration with architect and MIT professor <a href="https://archinect.com/firms/cover/149967714/carlo-ratti-associati" target="_blank">Carlo Ratti</a> and French structural engineer Michel Virlogeux for a new bridge in Baltimore that would replace the collapsed <a href="https://archinect.com/news/tag/2480599/francis-scott-key-bridge-collapse" target="_blank">Francis Scott Key Bridge</a>.</p>
<p>The design, which was released ahead of next week’s preliminary reconstruction forum called by the Maryland Transportation Authority, calls for a cable suspension span totaling 2,300 feet with a 213-foot clearance and offering wider lanes and increased vessel navigation safety, structural maintenance monitoring technology, smart traffic management, and enhanced connection to the Harbor area. </p>
<p>Webuild had already famously contributed to the <a href="https://archinect.com/news/article/150210199/renzo-piano-designed-genoa-bridge-completed-in-record-15-months" target="_blank">rapid reconstruction</a> of <a href="https://archinect.com/news/tag/11683/renzo-piano" target="_blank">Renzo Piano</a>’s Morandi bridge replacement in <a href="https://archinect.com/news/tag/1188782/genoa" target="_blank">Genoa</a>, Italy, after the deadly <a href="https://archinect.com/news/article/150077709/motorway-bridge-collapses-over-houses-and-buildings-in-italy-leaving-20-dead" target="_blank">2018 collapse</a> that killed 43 people. The company is also expecting to begin constructing what will become the <a href="https://archinect.com/news/article/150417789/world-s-longest-suspension-bridge-is-moving-forward-in-italy-after-decades-of-pushback-and-delays" target="_blank">world's longest suspension bridge</a> over the Strait of Messina by the end of the year.</p>
<figure><p><a href="https://archinect.gumlet.io/uploads/e4/e41ee4338d26582fac43659d44260d89.png?auto=compress%2Cformat&enlarge=true&w=1028" target="_blank"><img src="https://archinect.gumlet.io/uploads/e4/e41ee4338d26582fac43659d44260d89.png?auto=compress%2Cformat&enlarge=true&w=514"></a></p><figcaption>Render...</figcaption></figure>
https://archinect.com/news/article/150417789/world-s-longest-suspension-bridge-is-moving-forward-in-italy-after-decades-of-pushback-and-delays
World's longest suspension bridge is moving forward in Italy after decades of pushback and delays Nathaniel Bahadursingh2024-02-25T08:00:00-05:00>2024-09-30T12:31:08-04:00
<img src="https://archinect.gumlet.io/uploads/1f/1fc0cb0817cc81b5c7bf0384e54b09c9.jpg?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><p>Construction of what would be the world's longest suspension bridge, connecting Sicily and mainland <a href="https://archinect.com/news/tag/18315/italy" target="_blank">Italy</a> over the Strait of Messina, could begin this year after the final design recently gained approval. The long-delayed project would stretch more than 10,800 feet if completed.</p>
<p>The controversial bridge is estimated to cost approximately $5 billion and take around seven years to build. It will feature three vehicle lanes and a central lane for rail. The structure is also designed to withstand 180-mile-per-hour winds and up to 7.1-magnitude earthquakes. </p>
<p>The concept has been in the works since the 1960s, and it wasn’t until 2003 that a preliminary design for it was approved. Since then, the project has experienced a cycle of being shelved and revived by various Italian governments in power. Critics of the endeavor have asserted that the bridge has been nothing more than a tool to win votes that would waste billions of dollars.</p>
<p>State-owned sponsor Stretto di Messina SpA (SdM) has long...</p>
https://archinect.com/news/article/150413365/webuild-wins-4-7-billion-contract-to-deliver-neom-s-trojena-artificial-lake
Webuild wins $4.7 billion contract to deliver NEOM's Trojena artificial lake Josh Niland2024-01-19T14:41:00-05:00>2024-10-25T04:07:38-04:00
<img src="https://archinect.gumlet.io/uploads/84/84ad9553c41f6eebc1021e393441e994.jpg?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><p>Italian contractor Webuild has won a $4.7 billion bid to deliver the central manmade water feature included in the <a href="https://archinect.com/news/tag/2136661/trojena" target="_blank">Trojena</a> mountainside resort concept that forms a vital part of Saudi Arabia’s <a href="https://archinect.com/news/tag/1035435/neom" target="_blank">NEOM</a> megadevelopment for 2030. </p>
<p>The contract calls for the construction of three dams and an artificial lake feature plus a new structure called the Bow that will house its 3,600-guest hotel and residences, complimenting a ski resort and network of experiential nature areas and wildlife reserves. </p>
<p>The roughly 1.7-mile-long lake itself will become the largest manmade body of water in Saudia Arabia, the firm says. Elevations at the site range from 4,920 to 8,530 feet. <a href="https://archinect.com/firms/cover/22215861/bechtel-inc" target="_blank">Bechtel</a> had been <a href="https://archinect.com/news/article/150332539/saudi-arabia-is-moving-forward-with-plans-for-a-ski-resort-in-neom" target="_blank">previously contracted</a> as the project manager. NEOM says they aim to have things completed in time for Trojena to host the 2029 Asian Winter Games. </p>
<p>Philip Gullett, the Executive Director – Region Head at Trojena, said in an update: “We have already completed around three million cubic meters of excavation at the la...</p>