Archinect - News 2024-05-08T09:31:16-04:00 https://archinect.com/news/article/150357275/new-construction-video-highlights-aecom-s-nearly-complete-intuit-dome-in-inglewood New construction video highlights AECOM's nearly complete Intuit Dome in Inglewood Nathaniel Bahadursingh 2023-07-19T13:35:00-04:00 >2023-10-25T11:01:09-04:00 <img src="https://archinect.gumlet.io/uploads/ac/aca3e98553309c04b848b50ba1f3f513.jpeg?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><p>Following reports of its <a href="https://archinect.com/news/article/150342358/new-clippers-nba-arena-tops-out-in-inglewood" target="_blank">topping out in March</a>, the <a href="https://archinect.com/firms/cover/106465/aecom" target="_blank">AECOM</a>-designed Intuit Dome, the future home of the Los Angeles Clippers, is taking shape ahead of its expected completion in 2024.&nbsp;</p> <p>A new video depicts the status of the project as of June 2023, where its standout steel frame with diagrid geometry can be seen wrapping the structure. This building skin is formed from a series of diamond-shaped, interwoven metal panels with multiple uses. According to the architects, the frame was inspired by the form of a basketball net as a ball passes through it.&nbsp;</p> <p><br>A vast array of <a href="https://archinect.com/news/tag/954273/solar-panels" target="_blank">solar panels</a> can also be spotted on the structure&rsquo;s roof. Intuit Dome is set to operate 100% <a href="https://archinect.com/news/tag/11037/zero-carbon" target="_blank">carbon-free</a>, powered fully by batteries and <a href="https://archinect.com/news/tag/11462/solar-power" target="_blank">solar power.</a> The design team, alongside the Clippers organization, worked towards initiatives that will earn the stadium a <a href="https://archinect.com/news/tag/30730/leed-platinum" target="_blank">LEED Platinum</a> certification.</p> <figure><p>The $1.2 billion, 18,000-seat arena will be the centerpiece of a larger <a href="https://archinect.com/news/tag/238888/mixed-use" target="_blank">mixed-use</a> project, including an 85,000-square-foot training faci...</p></figure> https://archinect.com/news/article/150342358/new-clippers-nba-arena-tops-out-in-inglewood New Clippers NBA arena tops out in Inglewood Josh Niland 2023-03-13T14:00:00-04:00 >2024-03-15T01:45:58-04:00 <img src="https://archinect.gumlet.io/uploads/c4/c48b8bedfa2a13dabc3954e58dd53ae1.jpg?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><em><p>According to the company&rsquo;s website , the new facility is designed to mimic the look and feel of &ldquo;the elegant form of a basketball net as a ball passes through it.&rdquo; It will feature five basketball courts, more than any other NBA arena. According to the company&rsquo;s website , the new facility is designed to mimic the look and feel of &ldquo;the elegant form of a basketball net as a ball passes through it.&rdquo; It will feature five basketball courts, more than any other NBA arena.</p></em><br /><br /><p>The <a href="https://archinect.com/firms/cover/106465/aecom" target="_blank">AECOM</a>-designed $1.2 billion construction <a href="https://archinect.com/news/article/150282014/the-los-angeles-clippers-break-ground-on-1-8-billion-intuit-dome" target="_blank">broke ground</a> in September of 2021 and is moving along schedule towards a 2024 completion. Its reported $260 million worth of community benefits are said to be the largest ever associated with an American sports arena project. In total, the arena will have a capacity for 18,000 future Clippers fans while their <a href="https://archinect.com/news/article/150321521/la-s-crypto-com-arena-is-getting-a-nine-figure-overhaul-courtesy-of-gensler-and-meis" target="_blank">current abode</a> undergoes a &ldquo;nine-figure&rdquo; overhaul courtesy of&nbsp;<a href="https://archinect.com/firms/cover/110659181/meis-design-studio" target="_blank">MEIS</a> and <a href="https://archinect.com/gensler" target="_blank">Gensler</a>.</p> <p>Once construction is finished, the arena, which sits due south of SoFi Stadium, will occupy a 28-acre site that includes a <a href="https://archinect.com/news/article/150275034/gensler-designed-deer-district-a-model-for-nba-cities" target="_blank">Deer District</a>-like public plaza, shopping areas, training facilities, and a 150-room hotel.&nbsp;</p> <figure><p><a href="https://archinect.gumlet.io/uploads/d4/d437bac809d699617ff8a563eee747f7.jpeg?auto=compress%2Cformat&amp;w=1028" target="_blank"><img src="https://archinect.gumlet.io/uploads/d4/d437bac809d699617ff8a563eee747f7.jpeg?auto=compress%2Cformat&amp;w=514"></a></p><figcaption>Previously on Archinect:&nbsp;<a href="https://archinect.com/news/article/150319680/concrete-frame-at-la-clippers-new-intuit-dome-arena-tops-out" target="_blank">Concrete frame at LA Clippers' new Intuit Dome arena tops out</a></figcaption><p><br></p><p>Los Angeles hopes it will serve as a key cog in their upcoming Metro Crenshaw/LAX line extension. The NBA has more photos of the new construction <a href="https://www.nba.com/clippers/photos/raising-the-roof-at-our-new-home" target="_blank">here</a>.<br></p></figure> https://archinect.com/news/article/150319680/concrete-frame-at-la-clippers-new-intuit-dome-arena-tops-out Concrete frame at LA Clippers' new Intuit Dome arena tops out Nathaniel Bahadursingh 2022-08-05T15:28:00-04:00 >2024-03-15T01:45:58-04:00 <img src="https://archinect.gumlet.io/uploads/91/918735f272a99015e955f58d86f357d7.jpeg?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><p>The&nbsp;<a href="https://archinect.com/firms/cover/106465/aecom" target="_blank">AECOM</a>-Hunt&nbsp;<a href="https://archinect.com/firms/cover/9126568/turner-construction-company" target="_blank">Turner</a>&nbsp;joint venture is&nbsp;celebrating the topping out of the <a href="https://archinect.com/news/tag/1484875/clippers-arena" target="_blank">Intuit Dome</a>&rsquo;s concrete frame, the future home of the Los Angeles Clippers.&nbsp;</p> <p>According to Turner, more than 200,000 hours of work were performed by 350 workers to complete the frame. During construction, 65,000 cubic yards of concrete were placed, and 6,600 concrete mix truck deliveries were completed. The largest foundation pour was 2,572 cubic yards, and the largest deck pour was 980 cubic yards.&nbsp;</p> <figure><p><a href="https://archinect.gumlet.io/uploads/77/77b2460d3af1c8f41051ce645816e595.jpeg?auto=compress%2Cformat&amp;w=1028" target="_blank"><img src="https://archinect.gumlet.io/uploads/77/77b2460d3af1c8f41051ce645816e595.jpeg?auto=compress%2Cformat&amp;w=514"></a></p><figcaption>Previously on Archinect: <a href="https://archinect.com/news/article/150282014/the-los-angeles-clippers-break-ground-on-1-8-billion-intuit-dome" target="_blank">The Los Angeles Clippers break ground on $1.8 billion Intuit Dome</a></figcaption></figure><p>&ldquo;What our construction team has achieved in the last six months is incredible,&rdquo; said Rames Sundaram, Project Executive at Turner. &ldquo;Our first foundation was poured on January 12th, and our last deck pour is on July 27th. So, in just six short months, we have completed what normally takes nine months of work. Really amazing!&rdquo;&nbsp;<br></p> <p>According to Turner Vice President Michael Marchesano, the swift completion of the concrete frame has en...</p>