Archinect - News2024-12-22T04:00:19-05:00https://archinect.com/news/article/150326842/first-of-its-kind-mass-timber-office-extension-completed-in-washington-dc
'First of its kind' mass timber office extension completed in Washington DC Niall Patrick Walsh2022-10-13T13:11:00-04:00>2024-10-25T04:07:38-04:00
<img src="https://archinect.gumlet.io/uploads/14/1418dc7334e88b6cc0ec69d9bdfbc00d.jpg?fit=crop&auto=compress%2Cformat&enlarge=true&w=1200" border="0" /><p>Work has been completed on the 80 M office building in <a href="https://archinect.com/news/tag/35048/washington-dc" target="_blank">Washington DC</a>. The project, which saw a three-story timber extension added atop an existing seven-story concrete building, is described by the design team as “the first commercial office building in Washington DC to feature a vertical extension constructed using <a href="https://archinect.com/news/tag/1038570/mass-timber" target="_blank">mass timber</a>.”</p>
<p>The 108,000-square-foot addition was designed by architects <a href="https://archinect.com/hickokcole" target="_blank">Hickok Cole</a> with <a href="https://archinect.com/aruparchitects" target="_blank">Arup</a> providing mass timber and sustainable building engineering services. Opened in September, the scheme is also the “first high-rise overbuild timber structure in North America” according to the team.
</p>
<p>Inside, the extension includes <a href="https://archinect.com/news/tag/229925/office-building" target="_blank">office</a> and amenity spaces with 15-foot-high ceilings and 12-foot-high windows as well as 4,000 square feet of outdoor amenities including a rooftop terrace.
</p>
<figure><figure><a href="https://archinect.gumlet.io/uploads/f3/f348916c15023de33644d0932a7f8e19.jpg?auto=compress%2Cformat&enlarge=true&w=1028" target="_blank"><img src="https://archinect.gumlet.io/uploads/f3/f348916c15023de33644d0932a7f8e19.jpg?auto=compress%2Cformat&enlarge=true&w=514"></a><figcaption>Photo by Ron Blunt for Columbia Property Trust</figcaption></figure></figure><p>According to Arup, the scheme’s realization required engagement with “restrictive <a href="https://archinect.com/news/tag/1300193/building-codes" target="_blank">code requirements</a>” in the United States pertaining to mass timber; ...</p>