The BCNC (Boston Chinatown neighborhood center) wanted the entrance to the main buildings to be altered for a better design to accommodate the rise in the centers numbers. They also wanted to add some design elements that were over looked in the first design phase. A group of 4 others and myself worked on a design for about 3 months.
Status: Unbuilt
Location: Chinatown MA
My Role: A part of the design team