Archinect
Sandra Caballero

Sandra Caballero

Miramar, FL, US

anchor

CDE2 NetZero Energy Housing Project

Net Zero Energy Construction is possible and affordable. Through this project our team if
challenged to prove this reality. From real state search, development, architectural design, systems
design, construction methods, life cycle and risk analysis, the design allows us to explore an
understand deeper the meaning of low energy consumption through functional contruction practices.
The site, a 1.4 acre located in the industrial area of renovated Hoewll Mill road, provides the perfect
environment for multifamily units. Our site is located adjacent to a residential area and 1 to 2 miles walkable distance from commercial center whcih makes it particularly special. While densely vegetated at the edges of the property, the orientation of the site, suggest for a narrow placement to avoid the southern exposure and be constantly ventilated by the north east heading winds.

 
 Read more

Status: School Project
Location: Atlanta, GA, US

 
Location
Location
Floor Plans
Floor Plans
Density and Neighborhood
Density and Neighborhood
Building Comfort Simulation
Building Comfort Simulation
Circulation and Materials
Circulation and Materials
Building Techniques and Technology
Building Techniques and Technology
Construction Estimate
Construction Estimate
Energy Demand
Energy Demand
Construction Estimate
Construction Estimate
Geothermal and Heat Pump Comparison
Geothermal and Heat Pump Comparison
Construction Estimate
Construction Estimate
Life Cycle Mono-Crystalline Silicon
Life Cycle Mono-Crystalline Silicon
Life Cycle Evacuated Tubes
Life Cycle Evacuated Tubes
Life Cycle Ground Source Heat Pump
Life Cycle Ground Source Heat Pump
Risk Analysis
Risk Analysis

Back to Top  ↑Back to Project List...

Please wait... loading