Archinect
J. F. Bautista

J. F. Bautista

Astoria, NY, US

anchor
Winter time
Winter time
5 more images  ↓

2014 - Marine Terminal

The Caven Point Marine Terminal facility design seeks to identify the three major program components of the facility through its architecture. For programming purposes, the design team identified the three major building components for the CPMT as:

  1. Administrative Offices.
  2. Warehouse / Labs.
  3. Maintenance Facilities.

Due to the impacts of coastal flooding and storm surge, special attention had to be given to the facility’s planning in an effort to protect the building in the event of a storm equivalent to Superstorm Sandy. Upon review of the programming graphics, it will be realized by the reviewer that each component has specific operational and functional requirements that can be identified in both plan and elevation which relate to the durability requirement and the area sensitivity of the components contained within.

 
 Read more

Status: Unbuilt
Location: Caven Point
My Role: Architect

 
Second sketch before start modeling in the computer
Second sketch before start modeling in the computer
First sketches based in the customer's requirements
First sketches based in the customer's requirements
Sketch of the roof plan
Sketch of the roof plan
Roof plan and elevation
Roof plan and elevation
Site location
Site location

Back to Top  ↑Back to Project List...

Please wait... loading