Archinect

University of Houston (Michael)

 

Archived

Sep '06 - Nov '08

 
  • anchor

    Montana Airport: Specific Diagrams & Section Studies Deadline

    ichweiB Oct 11 '06 0

    Bruce Webb headed to Chicago today for something. So, studio was a little more relaxed. We have a week to work on updated plans, a site plan, and a section model. The section model is to be a 40' section detailing the construction of the airport. I was still in limbo as to how I am going to actually do that, so I worked out a few more diagrammatic studies to wrap up my design so that the building construction will flow seemlessly-as I hope. As mentioned earlier, the very beginning of the process took into close consideration of how it would actually get built, but now it is time to get down to the specifics. Here are a few pictures: our new studio coffee pot, some study models of my airport, and the diagrams I worked out. imageimageimageimageimageimageimage

     

     
  • ×Search in:
 

Affiliated with:

Authored by:

  • ichweiB

Other blogs affiliated with University of Houston:

Recent Entries


Please wait... loading
Please wait... loading