Archinect

Kansas State University

  • anchor

    Design Build

    Reverb Sep 29 '04 0

    Last semester Kstate started a design build studio for fourth and fifth year students...the first project: new studios, a lecture space, and a cafe and supply store in the basement of our very own Seaton Hall. Here are some pictures of the construction process last spring....The basement will not be complete until early next semester but is coming along nicely.

    image

    image

    image

    image

    image

    image

     

     
  • ×Search in:
 

Affiliated with:

Authored by:

  • Reverb

Other blogs affiliated with Kansas State University:

Recent Entries


Please wait... loading
Please wait... loading